Maldens and Coombe Planning Sub-Committee decided this item on Wednesday 20 May 2015. Below is the council's own wording, with the papers it was decided on.
Resolved that the London Borough of Merton (for Shared Legal Service) and the Interim Head of Planning and Transport be authorised to: 1. Issue an enforcement notice(s) under S.172 of the Town and Country Planning Act 1990 (as amended) 2. To withdraw and vary such notice(s) under S.173A 3. In the event of non-compliance, take action by way of prosecution under S.179, S.187 and/or direct action under S.178 of the Act in respect of the breach of planning control or for injunctive relief under S.187B. Voting: Unanimous
Word for word from the decision Kingston upon Thames published for this meeting.Source: moderngov.kingston.gov.uk
Report to Maldens and Coombe Planning Sub-Committee
Summary
The breach of planning control relates to the erection of a means of enclosure adjacent to a highway, exceeding permitted development tolerances and without the benefit of planning permission. Authority is therefore sought to issue an enforcement notice(s) requiring the demolition of the means of enclosure. It is RECOMMENDED that the London Borough of Merton (for Shared Legal Service) and the Interim Head of Planning be authorised 1. to issue an Enforcement Notice (s) under S. 172 of the Town and Country Planning Act 1990 (as amended), 2. to withdraw and to vary such notice (s) under S. 173A ,
3. in the event of non-compliance, take action (s) by way of prosecution under S. 179, S.187A and/or direct action under S. 178 of the Act in respect of the breach of planning control/or for injunctive relief under S.187B.
Site and Surroundings
1. The subject site comprises a two storey detached dwellinghouse located on the western side of Cromford Way near its junction with Buxton Drive. The surrounding area is entirely residential in character.
Breach of Planning Control
2. In June 2008 planning permission was granted for the erection of a rear dormer roof extension, single storey front and rear extension and conversion of garage to habitable room, application reference: 08/14293/FUL. 3. A planning enforcement investigation followed which established that the front extension had not been built in accordance with approved plans. It was also found that raised decking to the rear and a front means of enclosure comprising 1.8 metre high fencing behind the existing low brick boundary wall had been installed within the curtilage of the dwelling without planning permission. The planning merits of the unauthorised developments were considered and conclusion of this investigation was that it was not expedient to take further action. 4. In 2009 a planning application was submitted for the removal of the timber fencing and replacement with a brick boundary wall measuring between 1.2 and 2 metres high which was refused on 24 November 2009. 5. In 2012, the existing means of enclosure comprising a low brick wall and the unauthorised 1.8m fence was removed and replaced with a low brick wall at a height of approximately 0.4m high and brick piers finished with stone capping between 2.15-2.2m high with grey painted timber panelling between the piers. The means of enclosure is located along the front boundary adjacent to Cromford Way leaving a width of 5.25m for vehicular and pedestrian access. It is this means of enclosure that is the subject of this report. 6. The owner advises that the enclosure was erected for security reasons following a visit from the police and that raising the boundary wall, was one of the steps recommended by them. 7. In response to the breach of planning control the owner submitted an application for pre planning advice for the retention of the wall on 24 March 2014. A response was issued on 10 June 2014. Following this, an invalid planning application was submitted in February 2015 for part retention with alterations of the existing means of enclosure which at the time of writing this report remains invalid. Planning Considerations 8. The application is assessed against the polices of the current development plan which consists of the London Plan (July 2011) and the Councils adopted LDF Core strategy (April 2012). The Council’s Residential Design SPD (July 2013) is also a material consideration. The main considerations of the development are its impact on the character and appearance of the host dwelling and the surrounding area, impact on the residential amenities of the neighbouring occupiers and highway safety considerations.
Impact on the character and appearance of the surrounding area
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Maldens and Coombe Planning Sub-Committee at Kingston upon Thames and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.