Resolved
- That planning permission be Granted subject to the following conditions: Time Limits 1. The development hereby permitted shall be begun not later than 3 years from the date of this permission. Reason: Imposed pursuant to Section 91 (1) (a) of the Town and Country Planning Act 1990. Working Programme 2. The development shall be carried out, except where modified by the conditions to this permission, in accordance with the following documents: a) The Planning Application and supporting statements received by the Director of Environment and Public Protection on the 25 November 2010 and the emails dated 28 January 2011 by Matthew Buckley of United Utilities. b) Submitted Plans and documents: Drawing No. PRE0034/80021546/00/97/1001 Rev A entitled 'Site Location Plan' Drawing No. PRE0034/80021546/00/97/1002 Rev A entitled 'Proposed Site Plan' Drawing No. PRE0034/80021546/00/97/1003 Rev A entitled 'Proposed Outfall Headwall Details' Drawing No. PRE0034/80021546/01/12/1004 Rev A entitled 'Contractors working areas and compounds' Drawing entitled 'Map 2 Extended Phase 1 Habitat Survey Additional Areas' Drawing entitled 'Map 3 Water Vole Survey Map' Drawing No D2132.10.002 entitled 'Tree Removal and Protection Plan' c) All schemes and programmes approved in accordance with this permission. Reason: For the avoidance of doubt and to enable the LPA adequately control the development and to minimise its impact on the amenities of the local area and to conform with Policies 2 and 5 of the Lancashire Minerals and Waste Local Plan and Policies DP3 and H5 of the Preston Local Plan. 3. No development or any preliminary groundworks shall take place until: a) All trees to be retained during the construction works have been protected by fencing of the ‘HERAS’ type. The fencing shall be erected around the trees and positioned from the trees in accordance with British Standard 5837 “Trees in Relation to Construction”, and; b) Notices have been erected on the fencing stating “Protected Area (no operations within fenced area)”. Notwithstanding the above, no materials shall be stored or activity shall take place within the area enclosed by the fencing. No alteration, removal or repositioning of the fencing shall take place during the construction period without the prior written consent of the County Planning Authority. Reason: In the interest of visual amenity and to ensure protection for the existing natural environment and to comply with policy 2 of the Lancashire Minerals and Waste Local Plan. 4. No development shall commence ... view the full minutes text for item 4.