Resolved
That planning permission be g ranted subject to the following conditions: Time Limits 1. The development hereby permitted shall be begun not later than 3 years from the date of this permission. Reason: Imposed pursuant to Section 91 (1) (a) of the Town and Country Planning Act 1990. 2. Written notification of the date of commencement of the development shall be sent to the County Planning Authority within seven days of such commencement. Reason : In the interests of visual amenity and the amenity of local residents and to conform with Policy 101 of the Lancashire Minerals and Waste Local Plan and Policy CF1 of the Fylde Borough Local Plan. Working Programme 3. The development shall be carried out, except where modified by the conditions to this permission, in accordance with the following documents: a) The Planning Application received by the County Planning Authority on 16 November 2010. b) Submitted plans and documents received by the County Planning Authority on 16 November 2010: Drawing No. PRE0121/80021542/00/97/1001 Rev. A - Proposed Site Location Plan Drawing No. PRE0121/80021542/00/97/1002 Rev. A - Proposed Site Layout Drawing No. PRE0121/80021542/00/97/1003 Rev. B - Proposed Site Plan Showing Visibility Splays Drawing No. PRE0121/80021542/00/97/1004 Rev. B - Typical Control Kiosk & Gate Details Drawing No. PRE0121/80021542/00/97/1005 Rev. B - Proposed Outfall and Fence Details Drawing No. PRE0121/80021542/00/97/1006 Rev. B - Proposed Site Elevations Submitted documents received by the Director of Environment and Public Protection Services on 01 February 2011: Protected Species Additional Investigation & Assessment in Relation to Bats c) All schemes and programmes approved in accordance with this permission. Reason: To minimise the impacts of the development on the amenities of the local area and to conform with Policies SP2, EP12, EP19, EP30 and CF1 of the Fylde Borough Local Plan and Policies 5, 7, 8, 24, 37 and 101 of the Lancashire Minerals and Waste Local Plan. Site Operations 4. All plant, equipment and machinery used in connection with the operation and maintenance of the site shall be equipped with effective silencing equipment or sound proofing equipment to the standard of design set out in the manufactures specification and shall be operated in accordance with that specification at ... view the full minutes text for item 3.