Resolved
Resolved : That planning permission be granted subject to the following conditions: Time Limits 1. The development shall commence not later than 3 years from the date of this permission. Reason: Imposed pursuant to Section 91 (1) (a) of the Town and Country Planning Act 1990 . Working Programme 2. The development shall be carried out in accordance with the following documents: a) The Planning Application and Design and Access Statement received by the Director of Transport and Environment 13th February 2013. b) Submitted plans and documents: Drawing No. 8064-P01 Location Plan 8064-P02 Existing Site Plan 8064-P03 Existing Ground Floor Plan 8064-P04 Existing First Floor Plan 8064-P05 Existing Elevations 1 of 3 8064-P06 Existing Elevations 2 of 3 8064-P07 Existing Elevations 3 of 3 8064-P09 Proposed Ground Floor Plan Rev A 8064-P10 Proposed First Floor Plan Rev A 8064-P11 Proposed Elevations Rev B 1 of 2 8064-P12 Proposed Elevations Rev B 2 of 2 8064-P14 Proposed Site Plan Rev A 8064-P15 Proposed Fencing Alterations 1 of 2 8064-P16 Proposed Fencing Alterations 2 of 2 Reason: To minimise the impact of the development on the amenities of the area and to conform with Policies 1, 14, and 17 of the Central Lancashire Core Strategy . Notes The applicant's attention is drawn to the requirements of the Equality Act 2010 and the British Standards Institution Code of Practice for Design of Buildings and their approaches to meet the needs of Disabled People (BS8300:2009). The design of the building will also need to comply with Part M of the Building Regulations 2010. In the case of educational buildings, the applicant's attention is drawn to the Special Educational Needs and Disability Act 2001 and the guidance prepared by the Department of Education and Skills Building Bulletin 91 (Access for the Disabled to School Buildings) and Building Bulletin 94 (Inclusive School Design).