Chorley Borough: LCC/2026/0004. Land to the North of Myles Standish Way, Heath Charnock, Chorley, PR7 3FT

Decided Planning 3 papers

AI summaryLancashire County Council grants planning permission for a temporary vehicular access on Green Belt land in Heath Charnock, Chorley, to support United Utilities sewer and storm tank works, with conditions covering time limits, highways and site restoration.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeDecidedSubject to conditions in Appendix A
MoneyNot stated
What happens nextThree-year time limit to beginAccess to be removed within three months of tank completion
Who it affectsResidents near B5252 Duxbury MillHeavy goods vehicles rerouted from residential streets

What was decided

Planning permission was granted for a temporary vehicular access onto the B5252 at Duxbury Mill, Heath Charnock, to support permitted United Utilities construction works. Report P2, P3, P7

The permission is subject to conditions covering time limits, working programme, highway matters and site restoration, as set out in Appendix A. Report P3, P76

Why

The access would keep heavy construction traffic away from nearby residential streets while United Utilities build a below-ground detention tank and sewer infrastructure to reduce storm overflows into the River Yarrow. Report P7, P35, P45

Officers concluded the proposal would not harm highway safety following amended plans requiring HGVs to turn left in and right out, with a U-turn at a roundabout about 500 metres west. Report P41, P42, P43

The temporary access on a narrow strip of Green Belt was judged not inappropriate, as the access preserves openness and the works would be fully reinstated. Report P51, P58, P60, P61

What happens next

A Biodiversity Gain Plan must be submitted to and approved by Lancashire County Council before development can begin. Report P95, P96, P98, P99

The temporary access must be removed and the site reinstated within three months of completing the storm water retention tank, with replacement planting managed for five years. Report P91

If any protected species are found during works, work must stop and Natural England advice sought on licensing. Report P101

Options considered

  • Chosen: Grant planning permission subject to conditions in Appendix A. Access needed to support United Utilities flood and pollution reduction works; not harmful to highway safety, residential amenity, ecology or Green Belt openness given its temporary nature. Report P3, P43, P46, P50, P61, P63

Implications

  • Legal: The decision is considered a proportionate response under the Human Rights Act 1998, balancing property rights with the public interest in economic well-being, health and safety. Report P68
  • Equalities: The Public Sector Equality Duty has been applied; no disproportionately adverse impact on any protected characteristic group is anticipated. Report P72, P73, P74
  • Climate: The underlying United Utilities works aim to improve management of storm overflows to the River Yarrow and reduce environmental impacts. Report P7, P35
  • Risk: No significant risks are associated with the decision-making process provided the decision is based on the evidence in the report. Report P75
  • Financial: There are no financial implications for the county council in following the recommendation. Report P70

Who and where

  • Residents of Duxbury Gardens, Carr Lane and other nearby streets, who raised objections on safety, noise, vibration, dust, fumes, loss of trees and wildlife concerns Report P25, P26
  • United Utilities, as the operator carrying out permitted development sewer and detention tank works Report P7, P63
  • Pedestrians, cyclists and other road users on the B5252, with temporary warning signage required during construction Report P8, P41
  • County Councillor Chris Snow, who supported the application Report P19

Timeline

  • Within three years of the permission: Development must begin, in line with the standard time limit condition. Report P80, P81
  • First half of 2026: Permitted United Utilities construction works are expected to begin. Report P7
  • 2027/2028: The temporary access is likely to be required until this period. Report P7
  • Within three months of completing the storm water retention tank: The temporary access must be removed and the site reinstated. Report P91

Plain English for the jargon

  • Permitted development: Works that do not require a separate planning application, subject to limits and conditions set out in national legislation.
  • Detention tank: An underground tank used to hold back storm water during heavy rainfall, releasing it slowly to reduce flooding and pollution.
  • Bell-mouth access: A widened section of road shaped like a bell, allowing vehicles to turn in and out of a site safely.
  • Biodiversity net gain: A requirement that development delivers at least a 10 percent improvement in biodiversity compared with the site before development, through on-site measures or off-site credits.
  • Section 38 (6): A requirement in the Planning and Compulsory Purchase Act 2004 that planning applications are determined in line with the Development Plan unless material considerations indicate otherwise.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item8

Resolved

That planning permission be granted, subject to the conditions relating to time limits, working programme, highway matters and site restoration as set out in Appendix 'A' of the Committee report.
Word for word from the decision Lancashire & Rossendale published for this meeting. Source: council.lancashire.gov.uk

Follow this further

Built from Lancashire & Rossendale's papers

What the report saysPro

Report to Development Control Committee

Summary

Purpose of the report

To consider and determine the following planning application:

Chorley Borough: LCC/2026/0004 Construction of a temporary vehicular access to facilitate permitted development works, Land to the North of Myles Standish Way, Heath Charnock, Chorley, PR7 3FT.

Recommendation

The Development Control Committee is asked that planning permission be granted subject to the conditions relating to time limits, working programme, highway matters and site restoration as set out in Appendix 'A'.

Background

Description and Location of the site

1. The application site is on land to the north of the B5252 at Duxbury Mill in Chorley and is next to the public highway. The proposed new access point onto the B5252 would enable construction vehicles to enter and leave the site without having to travel through nearby residential streets. The temporary access is intended to serve nearby United Utilities works, which are located next to the River Yarrow. At the point where the access is proposed, the land forms a narrow strip of the Green Belt, measuring about 17 metres in depth. The United Utilities works themselves are within the main built-up area of Chorley and are not located in the Green Belt.

Applicant's Proposal

2. The applicant is seeking planning permission for a temporary vehicular access to support United Utilities infrastructure works on land north of the B5252 at Duxbury Mill, Chorley. The permitted development infrastructure works (not requiring separate planning permission) relate to the construction of a below ground detention tank, below ground sewer infrastructure and manholes at ground level, which form part of a wider programme to improve the management of storm overflows to the River Yarrow and reduce environmental impacts. To enable the construction phase, a dedicated temporary access point is proposed specifically for heavy goods vehicles, while an existing access would continue to be used by light vehicles only. Permitted development works are expected to begin within the first half of 2026 and the access is likely to be required until sometime in 2027/2028.

3. The proposal includes the formation of a temporary bell-mouth access with dropped kerbs, tactile paving and appropriate surfacing to safely accommodate construction traffic. Heavy goods vehicles would follow a controlled routeing plan, entering and exiting the site from the B5252 to minimise conflict with other road users. Temporary signage would be installed on the public highway to warn drivers of construction traffic and to instruct HGV drivers on permitted turning movements, including a right turn exit only strategy with U turns completed at a nearby roundabout where required.

4. The proposed temporary site access would include a metal access gate measuring 6 metres wide and 2.4 metres high. This gate would form the main vehicle entry point from the B5252 onto the construction site. The access bell- mouth itself would be formed to accommodate heavy goods vehicles and would align with this 6 metre wide access arrangement.

5. The overall area covered by the proposed temporary access works and associated permission boundary is identified as approximately 770 square metres.

Planning policy

6. National Planning Policy Framework:

Planning Practice Guidance accompanying the National Planning Policy Framework

7. Chorley Local Plan 2012 – 2026:

Policy BNE1 Design Criteria for New Development

Relevant planning history

8. There is no relevant planning history. Summary of consultation responses and publicity exercise

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Appendix BAppendix B 3.9 MB Download
PDF
Chorley Borough: LCC/2026/0004. Land to the North of Myles Standish Way, Heath Charnock, Chorley, PR7 3FTReport 176 KB DownloadRead as text
PDF
View item 8. as DOCX 114 KBReport 9 pages Download

At this meeting

Whole meeting

Who was there

12 of 19 attended
CS
CC S Gummer Lancashire County CouncilChair, present
CT
CC T Lord Lancashire County CouncilDeputy Chair, present
CT
CC T de Freitas Lancashire County CouncilCommittee Member, present
CR
CC R Edwards Lancashire County CouncilCommittee Member, present
CL
CC L Hutchinson Lancashire County CouncilMonitor
CM
CC M Jones Lancashire County CouncilCommittee Member, present
CA
CC A JoynesCommittee Member, present
CH
CC H Mills Lancashire County CouncilCommittee Member, present
CA
CC A Owens Lancashire County CouncilCommittee Member, present
CK
CC K Snape Lancashire County CouncilCommittee Member, present
CL
CC L Thomson Lancashire County CouncilCommittee Member, present
CC
County Councillor Martyn SuttonCommittee Member, present

All 19 on the meeting page

On this subject at Lancashire & Rossendale

Search all
  1. Chorley Borough: LCC/2026/0004. Land to the North of Myles Standish Way, Heath Charnock, Chorley, PR7 3FTThis decision
  2. Chorley Borough: application number: LCC/2023/0019 Retention of the Waste Transfer Station, Leachate Plant, Gas Plant and related infrastructure at Clayton Hall Landfill Site, Dawson Lane, Whittle-Le-WoodsDecided
  3. Chorley Borough: application no LCC/2022/0002 Variation of condition 2 of planning permission LCC/2019/0054 to allow the golf course re-contouring operations and restoration operations to continue until 23 March 2023. The Laurels at Charnock, Preston Road, Charnock Richard.Decided
  4. Chorley Borough: Application number LCC/2020/0052 Erection of recycling wash plant to process selected wastes at Common Bank Works, Common Bank Lane, ChorleyDecided
  5. Highways Act 1980 - Section 119 Wildlife and Countryside Act 1981 - Section 53A Proposed Diversion of Part of Footpath Heapey 27 at Black Lion Farm, Wheelton, Chorley BoroughDecided
  6. Lancashire County Council (Various Roads, Burnley, Chorley, Fylde, Hyndburn, Pendle, South Ribble, West Lancs and Wyre Boroughs, Lancaster and Preston City) (Revocation, Various Parking Restrictions and Amendment to Permit Provisions January (NO1)) Order 202*Approved

More from Lancashire & Rossendale Development Control Committee

All decisions
MeetingDecisionOutcome
15 Jul 2026 Minutes of the last meeting held on 10 June 2026That the minutes of the meeting held on 10 June 2026 be confirmed and signed by the Chair. Decided Open
15 Jul 2026 West Lancashire Borough: application number LCC/2025/0022. Ravenhead Quarry, Chequer Lane, Up Holland, WN8 0DDThat planning permission be granted , subject to the conditions detailed in Appendix 'A'. Decided Open
15 Jul 2026 West Lancashire Borough: application number LCC/2025/0023. Ravenhead Quarry, Chequer Lane, Up Holland, WN8 0DDThat planning permission be granted , subject to: (i) The conditions detailed within Appendix 'A'. (ii) An amendment ... Decided Open
15 Jul 2026 Decisions taken on development control matters by the Director of Environment and Planning in accordance with the County Council's Scheme of DelegationThat the report be noted. Noted Open
15 Jul 2026 Date of Next MeetingThat the next meeting of the Committee be held on Wednesday, 2 September 2026 at 10.00am in Committee Room B – The Di... Decided Open