Resolved
The Committee noted the contents of the report.
LEP - Transport for Lancashire Committee noted this item on Friday 5 June 2015. Below is the council's own wording, with the papers it was decided on.
Resolved
The Committee noted the contents of the report.
A key challenge for the East Lancashire Highways and Transport Masterplan is establishing the optimum balance between outward connectivity and internal accessibility to jobs, education and training. East Lancashire's rail network is relatively constrained in terms of connectivity, capacity, performance, journey quality, journey times and passenger facilities at many of the smaller stations. The network will continue to need significant investment if it is to support the local economy into the future; without such investment, the perception of East Lancashire as being poorly connected is likely to grow.
Over the past ten years, the County Council, the Community Rail Partnerships, local councils and others have supported a range of improvements to the rail network in East Lancashire that have resulted in increasing passenger numbers. Further improvements are planned, for example, infrastructure enhancements to facilitate provision of an all-day, half hourly service between Blackburn and Manchester and the new Northern franchise, which will deliver new and refurbished trains, improved services and better stations. However, in themselves, they will not address the fundamental issue of whether or how the rail network can contribute towards a transformational change in East Lancashire's economic fortunes.
The East Lancashire Rail Connectivity Study has examined this issue in depth, adopting a Conditional Outputs approach in accordance with standard rail industry practice and recognising that to deliver transformational change to East Lancashire's rail network will require the support of Network Rail, Rail North and the relevant Train Operating Companies. It has concluded that improving service frequency and journey times would deliver the greatest level of benefit, with electrification of the routes between Preston and Leeds / Colne and Clitheroe / Blackburn and Bolton / Manchester together with associated rolling stock improvements and enhanced service frequencies making the most significant contribution.
The Conditional Output Statement will strengthen Lancashire's case when engaging with the Department for Transport, Rail North, the wider rail industry and adjacent transport authorities to secure improvements to East Lancashire's rail network, in particular, with regard to the next rail industry investment period covering 2019 to 2024 ('Control Period 6'). Recommendation
The Committee is invited to note the contents of this report.
1.1East Lancashire is perceived as an area that is poorly connected with a transport network that hinders the efficient movement of both people and goods, and that this relative isolation has a negative impact on economic development and impedes regeneration. A key challenge for the East Lancashire Highways and Transport Masterplan is establishing the optimum balance between outward connectivity and internal accessibility to jobs, education and training.
1.2Apart from the M65 and M66/A56 'Gateways' linking East Lancashire to the west and south respectively and which are of a reasonable standard, roads tend to follow historic routes dictated by the topography rather than travel demand; consequently, most are poorly aligned and unsuitable for carrying high volumes of traffic, particularly heavy goods vehicles. Main line rail links are likewise constrained, with resulting low line speeds having a significant impact on journey times, or as is the case with Rossendale, no longer exist. Although both road and rail routes continue across the Pennines into the Leeds City Region, they are of a much lower quality than those further south that link Liverpool and Manchester with Leeds, Sheffield and the Humber ports.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
East Lancashire Rail Connectivity Study Conditional Output StatementReport | 112 KB | DownloadRead as text |
PDF |
Item 7: Appendix A East Lancashire Rail Connectivity Study Conditional Output StatementAppendix | 9.6 MB | Download |
PDF |
View item 7. as DOCX 46 KBReport | 5 pages | Download |
Follow LEP - Transport for Lancashire Committee at Lancashire & Rossendale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 30 Jan 2020 | South East Blackburn Funding ApplicationThat the Lancashire Enterprise Partnership Board be recommended to grant the scheme a maximum of £9.05m Growth Deal f... | Decided | Open |
| 5 Jun 2019 | Matters ArisingThat the update be noted . | Noted | Open |
| 5 Jun 2019 | Preston Western Distributor Funding ApplicationThat the Lancashire Enterprise Partnership be recommended to grant the scheme a maximum £58m Growth Deal funding, sub... | Approved | Open |
| 5 Jun 2019 | Preston Rail Station HS2 Hub - Assessment of Wider Economic benefitsThat the contents of the report be noted. | Noted | Open |
| 5 Jun 2019 | Exclusion of Press and Public- That the press and members of the public be excluded from the meeting during consideration of the following item of... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.