Resolved
That the removal of the footway and construction of a cycle track with right of way on foot and the implementation of 'No Waiting at any time Restrictions' as set out in the report be approved.
Cabinet approved this item on Thursday 16 May 2019. Below is the council's own wording, with the papers it was decided on.
Resolved
That the removal of the footway and construction of a cycle track with right of way on foot and the implementation of 'No Waiting at any time Restrictions' as set out in the report be approved.
It is proposed to provide a cycle track with right of way on foot along a length of Hud Hey Road and Rising Bridge Road, Haslingden, forming part of National Cycle Route 6. Proposals for waiting restrictions required in conjunction with the cycle track are also described and decision sought regarding implementation.
Cabinet is asked to approve the removal of the footway and construction of a cycle track with right of way on foot and the implementation of 'No Waiting at any time Restrictions' as shown in Appendix 'A'.
Background and Advice
The East Lancashire Highways and Transport Masterplan includes creation of an East Lancashire Strategic Cycleway Network. National Cycle Route 6 (NCR6) forms part of this network, providing a cycle route between Accrington to the north and the Lancashire boundary near Stubbins to the south.
As part of the scheme, Hud Hey Road and Rising Bridge Road, require an existing length of footway to be removed, widened and replaced by a cycle track with public right of way on foot, the width of which will generally be 3m. This additional width will be obtained by narrowing the carriageway, but sufficient carriageway width above minimum design standards will be maintained. A short length of the cycle track will still be below 3m due to land constraints. It is suggested that it is acceptable that short sections are able to be below 3m so long as safety considerations are still met. The lesser width is 2.3m where it tapers down to this width from an initial 3m over a distance of 37m. Here it is advised that there is sufficient visibility over this length for the lesser width to be acceptable over the short length.
To support the construction of a shared use cycletrack, 'No Waiting at Any Time' restrictions are required to prohibit vehicles obstructing users, and provide appropriate visibility of the proposed uncontrolled crossing.
A review of current parking was undertaken prior to the measures being developed, this indicated that Hud Hey Road was being used for on-street parking by residents with a higher concentration during evenings on the bridge over the A56 bypass. The cycle track and waiting restrictions proposed have been designed to minimise the loss of on-street parking in this area, however, to deliver an appropriate solution, the available space for on street parking will be reduced.
Consultations
Formal advertising of the proposed waiting restrictions was undertaken during December 2018. The objections are summarised below:
1. On street parking space will be lost or reduced with parking displaced to surrounding roads, increasing danger to cyclists and pedestrians. The parked vehicles currently reduce the speed of HGVs travelling along the road and displacement of the parked vehicles will negatively impact on residents.
In response, surveys have indicated a level of on street parking within the proposed restricted areas and the surrounding roads. As these vehicles currently obstruct the footway and/or impair visibility, it is proposed to provide restrictions along the new cycle track to remove this problem. The creation of the cycle track will also reduce the conflict between cyclists and motorists by providing cyclists with a safer alternative to the carriageway. Whilst it is accepted that parking will be displaced, and residents wanting to park may be inconvenienced, the cycle track will provide a safer route for cyclists and pedestrians.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Appendix AAppendix A | 1.4 MB | Download |
PDF |
Hud Hey Road, Haslingden: Shared Use Cycle Track and Waiting RestrictionsReport | 130 KB | DownloadRead as text |
PDF |
View item 7. as DOC 157 KBReport | 4 pages | Download |
Follow Cabinet at Lancashire & Rossendale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 3 Sep 2026 | Minutes of the Meeting held on 2 July 2026That the minutes of the meeting held on 2 July 2026 be confirmed as a correct record and signed by the Chair. | Decided | Open |
| 3 Sep 2026 | Quarter 1 2026/27 Corporate Performance ReportThat, following consideration of the performance of the Council in Quarter 1 of 2026/27 against the ambitions set out... | Noted | Open |
| 3 Sep 2026 | 2026/27 Quarter 1 Financial Monitoring ReportThat i. The current forecast Revenue Budget overspend at Quarter 1 of £15.655m (1.18%), as detailed in Appendix 'A' o... | Noted | Open |
| 3 Sep 2026 | Ofsted Inspection of Lancashire Children's ServicesThat, following consideration of the outcome of the inspection, which confirmed that Lancashire's Children's Services... | Approved | Open |
| 3 Sep 2026 | SEND Capital ProjectThat i. Following consideration of the positive consultation responses, the prior approval of those projects through ... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.