That; The approach in development of the - Code of Practice for Developer and Third-Party Works as outlined in the report be approved; The Director of Strategy and Performance be authorised to approve and publish the Palette of Materials Code of Practice in consultation with the Cabinet Member for Highways and Transport. The Head of Service - Asset Management be authorised to permit exemptions from Palette of Materials in appropriate circumstances.
Word for word from the decision Lancashire & Rossendale published for this meeting.Source: council.lancashire.gov.uk
(i) Approve the approach in development of the Palette of Materials - Code of Practice for Developer and Third-Party Works outlined in this report.
(ii) Authorise the Director of Strategy and Performance to approve and publish the Palette of Materials Code of Practice in consultation with the Cabinet Member for Highways and Transport.
(iii) Authorise the Head of Service - Asset Management to permit exemptions from Palette of Materials in appropriate circumstances. Detail
The need for an approved palette of materials is borne out of the increased use of 'exotic' materials on schemes including public realm works. The materials are chosen and specially imported on a scheme-by-scheme basis and are typically imported from long distance. This means that when any materials fail or third parties need to excavate the materials it is difficult to source replacements, in addition the matching of the colour palette can be problematic. The materials themselves are typically laid on high strength, thin set bedding which requires specialist lifting equipment, which third parties either do not have or choose not to use. The result is that the materials are broken up as part of the third party works and temporary asphalt reinstatement used until similar replacements are sourced, this can take a considerable time and is happening frequently throughout the county.
The Palette of Materials Code of Practice provides the requirements on the choice and use of materials for new developments including housing, industrial and other third party works on proposed or existing highways The code of practice avoids detail regarding tolerance and other workmanship issues and concentrates on the specifics of the materials themselves with the focus being on sustainability, maintainability, and appearance.
The proposed standard palette of surfacing materials is made up of the following:
• Thin Surface Course • Stone Mastic Asphalt • High Stone Content Hot Rolled Asphalt • Chipped Hot Rolled Asphalt • Close Graded Asphalt Concrete • Dense Asphalt Concrete • Precast Concrete Flags • Precast Concrete Blocks • Precast Concrete Kerbs • Trees
These materials are easily available within the local supply chain, have a history of successful use in Lancashire and are easily maintainable.
It is intended that each material data sheet is studied by each scheme promoter, with particular focus on any application restrictions. Any application of a material in a situation that is restricted will be classed as an enhanced material and as such will attract a commuted sum for the additional maintenance burden placed upon the authority.
The enhanced materials are included with the aim of ensuring sustainability in how they are sourced, a lower initial and life cycle embodied carbon footprint, a record of longevity in service and ease of ongoing maintenance.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.