Resolved
That the proposed creation of a Toucan Crossing, as set out at Appendix 'A' of the report, be approved.
Cabinet approved this item on Thursday 6 July 2023. Below is the council's own wording, with the papers it was decided on.
Resolved
That the proposed creation of a Toucan Crossing, as set out at Appendix 'A' of the report, be approved.
Cabinet is asked to approve the proposed creation of a Toucan Crossing, as set out at Appendix 'A'.
Detail
The East Lancashire Highways and Transport Masterplan includes creation of an East Lancashire Strategic Cycleway Network. The 'Valley of Stone' route forms part of this network, providing a cycle route between Rawtenstall to the north and the Lancashire boundary near Whitworth, to the south.
Close to the centre of Rawtenstall, the route crosses a busy bypass called 'Bocholt Way'. At this location there is currently an uncontrolled crossing in place which is used regularly by pedestrians and cyclists. As well as serving the route it also provides a well-used link for nearby neighbourhoods to the town centre.
As part of the overall 'Valley of Stone' scheme a Toucan crossing has been proposed at this location to:
Allow cyclists and pedestrians to cross at the same point. Reduce risk and increase safety for cyclists and pedestrians attempting to cross. Allow cyclists and pedestrians to stop busy traffic on demand, reducing wait times, making the route more attractive and overall promoting active travel.
Consultations
Two formal consultations have been carried out on this Toucan crossing.
Consultation 1
In January 2021 the county council received a number of objections – all from horse riders who advised they regularly crossed at this point and objected that the crossing facility did not cater for horses. There was also correspondence from the Chair of the British Horse Society, who objected to the scheme and lobbied for better horse facilities in general.
Two letters of support were also received.
In response to the objections, the county council's Highways Design Team engaged with the British Horse Society, which provided a suggested non-standard design. Any design outside standards would eventually require Department for Transport approval, but initially several weeks were spent exploring a solution.
Finally, after a concept design was produced a full technical review was carried out by the Traffic Signals Design Team. Unfortunately, the design could not be supported on various safety and practical grounds. (The proposed non-standard design is set out at Appendix 'B').
The location has several limiting constraints, namely:
The presence of a 35 metre long bridge deck adjacent to the crossing. A side road T-junction 40 metres from the crossing. The proximity of a neighbouring NHS car park.
There were numerous reasons why the Traffic Signals Design Team was unable to support the design, the main ones are listed below:
The crossing would require horses to travel along sections of footway. This is not lawful or safe. The crossing itself is unconventional, outside design standards and would require Department for Transport approval, which would be extremely unlikely.
The layout itself is likely to cause confusion for drivers and other crossing users.
Equestrians would require a separate crossing lane, requiring acquisition of neighbouring health centre land.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Appendix AAppendix A | 376 KB | Download |
PDF |
Appendix BAppendix B | 2.9 MB | Download |
PDF |
Appendix CAppendix C | 37 KB | Download |
PDF |
Proposed Toucan Crossing, Bocholt Way, RawtenstallReport | 287 KB | DownloadRead as text |
PDF |
View item 10. as DOC 130 KBReport | 4 pages | Download |
Follow Cabinet at Lancashire & Rossendale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 3 Sep 2026 | Minutes of the Meeting held on 2 July 2026That the minutes of the meeting held on 2 July 2026 be confirmed as a correct record and signed by the Chair. | Decided | Open |
| 3 Sep 2026 | Quarter 1 2026/27 Corporate Performance ReportThat, following consideration of the performance of the Council in Quarter 1 of 2026/27 against the ambitions set out... | Noted | Open |
| 3 Sep 2026 | 2026/27 Quarter 1 Financial Monitoring ReportThat i. The current forecast Revenue Budget overspend at Quarter 1 of £15.655m (1.18%), as detailed in Appendix 'A' o... | Noted | Open |
| 3 Sep 2026 | Ofsted Inspection of Lancashire Children's ServicesThat, following consideration of the outcome of the inspection, which confirmed that Lancashire's Children's Services... | Approved | Open |
| 3 Sep 2026 | SEND Capital ProjectThat i. Following consideration of the positive consultation responses, the prior approval of those projects through ... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.