Resolved

That, subject to the signing of a Unilateral Agreement, Planning Permission be granted, subject to the following conditions, as set out in the case officer’s report: 1. Standard Time Limit. 2. Development to be carried out in accordance with the approved plans. 3. External Materials/Detailing. 4. Tree Protection Condition. 5. Development to be carried out in accordance with the submitted Landscaping Scheme (to be confirmed). 6. Development to be carried out in accordance with the submitted Arboricultural Method Statement (to be confirmed). 7. Bat mitigation to be implemented in full. 8. Use of property to be used in association with the cohousing scheme. 9. Hours of construction condition 0800-1800 Monday to Friday. 0800-1400 on Saturday, no works Sunday and Bank Holidays. 10. Development to be carried out in accordance with the recommendations of the submitted flood risk assessment. 11. Development in accordance with the surface water drainage strategy. 12. Implementation of the Travel Plan. 13. Permitted Development rights removed to all dwellings. 14. No sheds, buildings, enclosures to be erected on the areas of open space fronting the River Lune or the allotment gardens without prior consent.
Word for word from the decision Lancaster published for this meeting. Source: committeeadmin.lancaster.gov.uk

Follow this further

Built from Lancaster's papers

What the report saysPro

Report to Planning Regulatory Committee

Agenda Item Committee Date Application Number

A5 27 June 2011 11/00266/FUL

Application Site Proposal

Luneside Engineering Workshop Erection of one end-terraced dwelling to previously Mill Lane approved co-housing scheme (ref:10/00319/FUL) and Halton associated works Lancaster

Name of Applicant Name of Agent

[name removed]

Decision Target Date Reason For Delay

15 May 2011 Increased officer caseload

Case Officer [name removed] No

Approval subject to submission of Unilateral Summary of Recommendation Undertaking.

1.0The Site and its Surroundings

1.1The proposal relates to a 2.5 hectare linear site located between Mill Lane and the River Lune in Halton, approximately 3 miles east of the centre of Lancaster. The site lies on the right bank between Forge Bank Weir and Lower Halton Weir, bound by farmland to the east; ‘The Forge’ and ‘Out of the Woods’ commercial buildings to the north with farmland beyond; the River Lune to the south; and a mixture of recently developed residential dwellings to the west, mainly three-story, plus two commercial buildings now completed and occupied to the north west of the site.

1.2The site previously contained a number of former commercial buildings, including the Mill Building which dates back to the early 20th century, together with large areas of hardstanding, an unmade track which provides access to Forge Bank Weir, and important groups of trees, including a locally important woodland at the eastern end of the site which is protected by a Tree Preservation Order (TPO). The south banks of the site are generally covered with overgrown self-seeded vegetation, although there are some areas where stone outcrops are exposed. Since the approval of the original co-housing scheme back in summer last year, works to the Mill building have commenced along with other preparatory work.

1.3The site topography changes quite dramatically from the western end of the site where it is relatively flat to the eastern side of the site when the levels rise approximately 8.5m between the southern and northern boundaries. As a consequence of the site contours there are a number of large retaining walls plus two public rights of way passing through this part of the Halton Mills development site; one running along the higher northern part of the site and one running along the southern boundary adjacent to the River Lune.

1.4Halton Mills, as the area is now known, is accessed off Low Road adjacent to Town End Farm, which has recently been converted, opposite the village playing fields and allotments. It is approximately 1km up a 30m hill to the village amenities and services on High Road but closer to the community centre on Low Road. Access to the site itself is via the internal road system, which has now been constructed to adoptable standards. The remaining parts of the Halton Mills site linger in a state of flux, with the site subdivided into a number of plots with various land owners. Some parts of the site have been developed but regretfully most of the site has been left undeveloped or incomplete for some considerable time.

1.5In terms of land allocation, the site lies within the settlement of Halton within designated countryside area. The site sits very close to the western periphery of the Forest of Bowland Area of Outstanding Natural Beauty (AONB) and approximately 300m to Halton Conservation Area. The River Lune which borders the site is a Biological Heritage Site with designated informal recreation areas and green corridors running along side the river banks (Millennium Cycle Way). The site lies within Floodzone 3 and is also designated as an Existing Employment Site in the Lancaster District Local Plan.

2.0The Proposal

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Luneside Engineering Workshop, Mill Lane, HaltonReport 140 KB DownloadRead as text

At this meeting

Whole meeting

On this subject at Lancaster

Search all
  1. Luneside Engineering Workshop, Mill Lane, HaltonThis decision
  2. Luneside Engineering Workshop, Mill Lane, HaltonAgreed

More from Lancaster Planning Regulatory Committee

All decisions
MeetingDecisionOutcome
1 Sep 2026 Bus Station Central Drive MorecambeResolved : That prior approval for demolition is required and is granted. Approved Open
1 Sep 2026 Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap... Approved Open
1 Sep 2026 Auction Mart Car Park Thurnham Street LancasterResolved : That the application be approved subject to an additional condition regarding additional ground investigat... Approved Open
1 Sep 2026 Delegated ListThat the report be noted. Noted Open
27 Jul 2026 Land at Ashton Road LancasterResolved : That the application be approved subject to the following conditions: · the satisfactory completion of a L... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies