Planning Regulatory Committee, Monday 25 July 2011

Borrans Farm, Land Adjacent to Hill Side, Fall Kirk

Deferred Planning 1 paper

Planning Regulatory Committee deferred this item on Monday 25 July 2011. Below is the council's own wording, with the papers it was decided on.

Item33

Resolved

That the application be deferred to enable a site visit to take place on Monday, 15 th August 2011.
Word for word from the decision Lancaster published for this meeting. Source: committeeadmin.lancaster.gov.uk

Follow this further

Built from Lancaster's papers

What the report saysPro

Report to Planning Regulatory Committee

Agenda Item Committee Date Application Number

A11 25 July 2011 10/00903/FUL

Application Site Proposal

Borrans Farm Change of use of two redundant barns to workshop Land Adjacent To Hill Side and storage space for a local agricultural machinery Fall Kirk repair business (Use Class B2) Gressingham

Name of Applicant Name of Agent

[name removed] Jo Clark

Decision Target Date Reason For Delay

5 November 2010 Increase in officer caseload and awaiting additional information

Case Officer [name removed] No

Summary of Recommendation Approval

1.0The Site and its Surroundings

1.1The application site lies 200m to the west of the village of Gressingham between the edge of the village and Borrans Farm. The site lies on the edge of both Gressingham Conservation Area and the Forest of Bowland Area of Outstanding Natural Beauty. The site is a little under 1 acre and currently comprises two agricultural buildings, one large than the other.

1.2The land rises steeply both to the north behind the site and to the west past Borrans Farm (site is currently within the ownership of Borrans Farm). Land to east falls steeply down to Gressingham. A pair of detached residential properties abuts the eastern boundary of the site. The nearest dwelling is 22m from the buildings.

1.3The larger barn is steel framed with a mix of brick and blockwork infill. The upper elements of the walls and roof being cement fibre sheeting. The building is in a poor state of repair. The smaller barn is in a sound condition, it is again a steel framed building with low blockwork infill with the main section of walls cladding in Yorkshire boarding. The roof of the building is cement fibre roof.

1.4A concrete forecourt lies in front of the large barn with an existing vehicular access of Fall Kirk. To the rear of the building is open pasture linking onto a larger field. Stone boundary walls to the east and west with a mixed hedgerow to the roadside frontage.

2.0The Proposal

2.1The application is seeking consent for the change of use of the two barns and forecourt area into a workshop and storage space for an agricultural machinery repair business. The larger, taller barn is to be used for storage only and the smaller barn for machinery repair. The storage building is to be refurbished and generally upgrade but will essentially remain a barn with cement fibre sheeting to the main walls and roof.

2.2The low walls to the machinery repair building are to be raised to full height and sealed to an internally lined roof. The roof is to be lined with plywood and the void infilled with Rockwool insulation.

2.3In order to improve visibility at the junction with Fall Kirk, the boundary hedgerow is to be tapered back to 2.4m from the rear of the carriageway. Two areas of native planting are also to be introduced; one immediately behind the hedge line and the other to the side/rear of the buildings alongside the eastern boundary with the neighbouring residential property. The concrete forecourt area is to be extended to allow access to both barns.

2.4The applicant operates a mobile agricultural repair business but requires a permanent base form which to work from and carry out some repairs. In addition to the repair side of the business the applicant also runs a small plant hire business, currently two tree shredders.

2.5The business is seeking to operate from 7:30 am to 6:00pm Monday to Saturday. The applicant indicates that office work is undertaken first and last during the working day. Most of the applicant’s work is mobile with up to 30 hours a week spent off site. The nature of repairs is general agricultural engineering including tractors and agricultural machinery. Some short term storage of vehicles and machinery will occur this is to be housed securely in the larger barn. All repair works are to be undertaken inside the building. The external areas are to be for access and the parking of staff cars only, usually no more than two vehicles.

3.0Site History

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Borrans Farm, Land Adjacent to Hill Side, Fall KirkReport 130 KB DownloadRead as text

At this meeting

Whole meeting

On this subject at Lancaster

Search all
  1. Borrans Farm, Land Adjacent to Hill Side, Fall KirkThis decision
  2. Borrans Farm, Fall Kirk, Gressingham, LancasterRefused
  3. Borrans Farm, Land Adjacent To Hill Side, Fall KirkRefused

More from Lancaster Planning Regulatory Committee

All decisions
MeetingDecisionOutcome
1 Sep 2026 Bus Station Central Drive MorecambeResolved : That prior approval for demolition is required and is granted. Approved Open
1 Sep 2026 Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap... Approved Open
1 Sep 2026 Auction Mart Car Park Thurnham Street LancasterResolved : That the application be approved subject to an additional condition regarding additional ground investigat... Approved Open
1 Sep 2026 Delegated ListThat the report be noted. Noted Open
27 Jul 2026 Land at Ashton Road LancasterResolved : That the application be approved subject to the following conditions: · the satisfactory completion of a L... Approved Open