Resolved
That the application be delegated to the Head of Regeneration and Policy to approve, subject to resolution of tree issues and transport obligations and to the signing and completion of a Deed of Variation incorporating: Listed building works (to secure the conversion of the Annexe building) Open space contribution if the open space(s) are transferred to the Council Transport contribution of £500,000 Travel Plan and the following conditions, as set out in the case officer’s report, with amendment of conditions 18 and 29: 1. Standard Outline Permission Timescale – all matters reserved except access. 2. Amended proposals (list plans and documents). 3. Development in accordance with approved proposals. 4. Level 2 Programme of building recording of all buildings on site. 5. No demolition other than that specified or to be agreed. 6. Scheme for the future management and maintenance of the centre section, tower and main hall of the annexe building to be agreed. 7. All natural stone and slate and other reusable materials forming part of the buildings to be demolished to be retained, stored securely on site and reused. 8. Cricket pavilion to be retained. 9. Former cricket pitch to be retained as open recreational area to serve the development. 10. Equipped play facilities to be provided within the site and maintained. 11. Further bat surveys and associated mitigation to be implemented as necessary. 12. Arboricultural implication assessments to be agreed for each phase. 13. No tree loss and protection of existing trees. 14. Habitat protection and creation scheme. 15. Landscape and Wildlife Management Plan. 16. Landscaping scheme for each phase. 17. Japanese Knotweed control. 18. Scheme for off-site highways work, including site access with visibility splays, to be agreed and completed within an agreed timescale, including other off-site highway schemes. 19. Wheel cleaning facilities during construction. 20. Travel Plan. 21-24. 4 standard land contamination conditions. 25. Asbestos. 26. Noise assessment. 27. Pile driving. 28. Dust control. 29. Hours of construction (0800-1800 Monday to Friday and 0800-1400 Saturday only), no work on Sundays and Bank Holidays . 30. Separate drainage system. 31. Surface water management. 32. At least Level 3 of Code for Sustainable Homes. 33. At least 10% on site renewable energy generation. 34. Removal of PD rights.