Resolved
That, subject to the signing and completion of a Section 106 Agreement covering: 1. 20% affordable housing provision including 50/50 split between social rented and intermediate housing, type/size of affordable units based on the same proportionate split of total dwelling types/sizes across the site, phasing plan and occupancy criteria. 2. Foot/cycle links to Highfield Estate, including a ‘greenway’ through the application site. 3. Biological Heritage Site Management Plan. 4. Ongoing maintenance arrangements of on-site landscaped areas. Planning Permission be granted, subject to the following conditions, as set out in the case officer’s report: 1. Standard 3 year timescale. 2. Great Crested Newts and bat surveys required. 3. Biological Heritage Site Management Plan required – mitigation/compensation measures to be implemented. 4. Geological Heritage Site Management Plan required – mitigation/compensation measures to be implemented. 5. Arboriculture Implications Assessment incorporating an Arboriculture Survey, Tree Constraints Plan and Method Statement. 6. Adoptable highway details required. 7. Off site highway works, including the installation of MOVA technology to the canal bridge traffic lights, new road layout on Kellet Road, a roundabout at the junction of Back Lane and Kellet Road and central refuge on Kellet Road by Carnforth High School. 8. Protection of visibility splays. 9. Wheel cleaning facilities – temporary during construction. 10. Hours of construction. 11. Scheme for dust control – earth moving and construction activity. 12-15. Contaminated land conditions. 16. Asbestos. 17. Construction Method Statement. And Outline Planning Permission be granted, subject to the following conditions: 1. Outline Permission – Reserved Matters required (except access, site remediation and works to the Biological Site) 2. Illustrative plans only. 3. At least 10% on site renewable energy. 4. At least Code level 3. 5. Landscaping scheme required. 6. Site and plot boundary treatment. 7. Car parking arrangements. 8. Cycle storage facilities. 9. Travel Plan. 10. Refuse storage facilities. 11. Wheel cleaning facilities – temporary during construction. 12. Separate drainage system. 13. Surface water regulation system using a sustainable drainage system. 14. Hours of construction. 15. Construction noise – pile driving condition. 16. Scheme for dust control – earth moving and construction activity. 17. Details of ball-stop fencing around the football ground.