Resolved
That Planning Permission be granted, subject to the signing and completion of a Section 106 Agreement covering: 1. 20% provision of on-site 1, 2 and 3 bed affordable houses and apartments based on above housing mix in 8.1 above and a 50/50 split between social rented and intermediate housing – even split of tenure across house types/sizes. Legal agreement also to set out occupancy criteria. 2. £21,000 contribution to cycle path along New Quay Road. 3. £7,000 contribution to a footpath link to Sycamore Grove. 4. Provision and maintenance (by way of a private management company) of on-site open space and children’s equipped play area. And the following conditions, as set out in the case officer’s report: 1. Standard planning permission timescale. 2. Development to accord with plans – list of approved plans. 3. Phasing plan. 4. To meet at least Building Regulations 2010 standards. 5. Notwithstanding plans, samples of all external materials ( elevational treatment, roof materials, doors, windows, sills, lintels, garage doors, balconies, dormers), including colours and finishes to be submitted and agreed. 6. Surface materials to be agreed – samples required. 7. Refuse storage details. 8. Removal of PD rights. 9. Site boundary and plot boundary treatment. 10. Landscaping scheme to be agreed. 11. Native black poplars to be retained. 12. Arboriculture method statement and root protection areas to trees to be retained. 13. Provision of open space. 14. Habitat creation/enhancement and management plan. 15. Bat roosting facilities. 16. European eels – to be translocated . 17. Japanese knotweed and Canadian knotweed – to be treated. 18. Archaeological/building recording. 19. Wheel cleaning during construction. 20. Adoptable highway details required. 21. Off site highway works – traffic calming along New Quay Road and traffic light controlled junction at Damside Street/Bridge Lane/Cable Street junction (details and provision prior to occupation). 22. Protection of visibility splays. 23. Provision of garages and car parking. 24. Garage use restriction. 25. Cycle storage (for the apartments and houses without garages). 26. Travel Plan – details required. 27. Separate drainage system. 28. Surface Water Management Plan. 29. Finished floor levels. 30. Flood evacuation procedure. 31. Oil interceptors for parking courts. 32. Hours of construction Monday to Friday 0800 – 1800 and Saturday 0800 – 1400 only. 33. No pile driving. 34. AQ mitigation measures to be implemented. 35. Dust control. 36. Asbestos. 37-40. 4 contaminated land conditions.