Resolved
That subject to the signing and completion of a legal agreement prior to the determination date (otherwise the application be refused) that Planning Permission be granted subject to the following planning obligations: 39% affordable housing provision (4 social rented and 3 intermediate housing) Management company for the open space and the following conditions: 1. Standard 3 year timescale 2. Development in accordance with approved plans – list of plans 3. Samples to be provided – natural random rubble stone mortar render natural slate ridge tiles natural stone window and door surrounds timber window, doors and garage doors (including finishes and colours) 4. Details to be agreed – boundary treatments rainwater goods timber fascias (including finishes and colours) 5. Access arrangements 6. Visibility splays – provision and retention 7. Off site highway works – provision of a footpath within the existing verge along the site’s frontage, new/relocated refuge island, new street lighting, new gateway treatments to the village to reduce vehicle speeds and upgrades of the kerbs at the bus stops 8. Construction method statement 9. Separate drainage system 10. Development in accordance with Flood Risk Assessment including finished floor levels are set no lower than 300mm above existing ground levels within Flood Zone 2 and 150mm elsewhere and outfall rates of 4.4 l/s for 1:30 years and 5.9 l/s for 1:100 years plus critical storm 11. Surface Water Drainage Scheme – as per the drainage plan 12. Hours of construction (Mon to Fri 0800-1800 and Sat 0800-1400 only) 13. Unforeseen contamination 14. Importation of soil, material and hardcore 15. Prevention of new contamination 16. Bunding of tanks 17. Landscaping scheme and maintenance, including the provision of the public open space 18. No trees to be removed, cut down, lopped or crowned 19. Tree protection plan 20. External lighting