Resolved
That the application be deferred to allow outstanding matters (noise and air quality) to be resolved before the application is reported back to Planning and Highways Regulatory Committee for determination.
Planning Regulatory Committee deferred this item on Monday 5 January 2015. Below is the council's own wording, with the papers it was decided on.
Resolved
That the application be deferred to allow outstanding matters (noise and air quality) to be resolved before the application is reported back to Planning and Highways Regulatory Committee for determination.
Agenda Item Committee Date Application Number
A10 5 January 2015 14/01117/FUL
Application Site Proposal
Middleton Clean Energy Plant Erection of a 47.5mw gas fired power station and Middleton Road associated works Middleton Lancashire
Name of Applicant Name of Agent
[name removed] -
Decision Target Date Reason For Delay
20 January 2015 N/A
Case Officer [name removed] Yes
Approval (subject to a referral back to Chief Officer to Summary of Recommendation allow notice to be served on Natural England)
(i) Procedural Note
This application was presented to Planning Committee on 8 December 2014. Members resolved to delegate the application back to the Chief Officer (Regeneration and Planning) to determine unless there were outstanding items, or in the event that the Chief Officer was seeking to approve the application against a consultee’s sustained objection, in which case the application was to be reported back to the January 2015 Planning Committee. At the time of writing, there are still outstanding items, so the application is being reported back to Planning Committee as per last month’s resolution. The applicant’s consultants are liaising with the consultees to resolve the outstanding items, and the case officer is optimistic that there will be a positive update available for January’s Committee, which will be verbally provided at the meeting.
1.0The Site and its Surroundings
1.1This full application relates to an area of land which is part of the former Middleton Oil Refinery and is known locally as Middleton Wood. The site area is 0.476 hectares and comprises of mainly rough ground covered by inert tipped material upon which some natural regenerated vegetation occurs in parts.
1.2Part of the site comprises existing hard surfaces forming an original portion of the road network within the refinery site.
1.3The site abuts existing industrial sites which front Middleton Road and there is potential linkage through that land by an existing access road on the other side of the boundary. Although the land forms part of the wider Middleton Wood site which is in the City Council’s ownership, it has until relatively recently continued to be used for the reclamation of inert construction material and hence has not regenerated into natural habitat in the same way that the wider site area has.
1.4The site and its surroundings are subject to a number of designations, including Hazardous Substance Installations designations (Tradebe Solvent Recovery); a Radon Protected Area; a Minerals Safeguarding Area and is an area identified as being susceptible to groundwater flooding. Heysham industrial Estate, a waste site allocation, lies further to the south. The wider site includes a Biological Heritage Site designation.
2.0The Proposal
2.1The development consists of a 14m high, 1300sq.m industrial building which is to be used as a power hall housing five reciprocating gas engines. Fuel will be supplied from an existing underground natural gas pipeline. Emissions from the engines will be vented from a 25m high flue stack.
2.2The proposal is in effect a small gas powered powers station designed to provide on demand additional capacity at tomes when wind power is delivering less and demand is high. It is generally constructed off site and assembled on the land once consent is granted.
2.3Approximately 18 permanent staff in combinations of shift workers would be employed by the site. Vehicular access to the site both during and after construction would be over the existing estate roads.
3.0Site History
3.1The following application is relevant:
Application Number Proposal Decision 95/01352/DPA Change of use from derelict Shell/ICI works to Middleton Granted 1/4/1996 Community Wood
4.0Consultation Responses
4.1The following responses have been received from statutory and non-statutory consultees:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Middleton Clean Energy Plant, Middleton Road, MiddletonReport | 208 KB | DownloadRead as text |
Follow Planning Regulatory Committee at Lancaster and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 1 Sep 2026 | Bus Station Central Drive MorecambeResolved : That prior approval for demolition is required and is granted. | Approved | Open |
| 1 Sep 2026 | Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap... | Approved | Open |
| 1 Sep 2026 | Auction Mart Car Park Thurnham Street LancasterResolved : That the application be approved subject to an additional condition regarding additional ground investigat... | Approved | Open |
| 1 Sep 2026 | Delegated ListThat the report be noted. | Noted | Open |
| 27 Jul 2026 | Land at Ashton Road LancasterResolved : That the application be approved subject to the following conditions: · the satisfactory completion of a L... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.