Resolved
(1) That Planning Permission be granted subject to the following conditions: 1. Standard Time Limit 2. Plans and details approval list 3. Turbine and associated infrastructure shall be removed from site and land reinstated in accordance with a scheme to be agreed with the local planning authority before the expiry of 25 years from the turbine being operational 4. The wind farm operator shall notify the local planning authority within 1 month of the wind farm being operational 5. If the turbine fails to produce electricity to the gird for a continuous period of 6 months, it and associated infrastructure shall be removed and the land reinstated in accordance with a scheme to be agreed with the local planning authority 6. Subject to EDF comments micro-siting condition to allow 10m or precise location of turbine to be agreed (TBC) 7. Operations and maintenance programme to be agreed (given sensitive site location) this shall include confirmation that the turbine shall be fitted with vibration sensors/control system 8. Details of the design and external appearance of proposed turbine and substation to be agreed. No adverts on the turbine towers or blades. 9 Details of control building to be submitted including, siting, design and use of materials and any associated enclosures 10. No development shall commence until a Construction and Environment Management Plan has been submitted and agreed (this would include for example, a programme of phasing of construction works, noise and dust control, details of pile driving, health and safety measures, details of temporary site compounds, wheel washing facilities, drainage, temporary lighting, cable trenches, post-construction restoration of the site) 11. Construction hours – standard restrictions with ability to work later with prior written agreement of the local planning authority (Mon-Fri 0800 -1800, Sat 0800-1400, no work Sundays or Bank Holidays) 12. Details of a Construction Traffic Management Method Statement and its implementation, including pre-condition highway survey to be undertaken before delivery of abnormal loads (if abnormal loads are due by road) following delivery, a post highway condition to be undertaken. Any defects arising from the number/type of abnormal loads would require the developer to reinstate the highway within a prescribed period with the local planning authority 13. Habitat Mitigation to be secured and implemented before commencement of development and maintained for the lifetime of the development including mitigation measures at the former helipad 14. Shadow flicker – scheme for ... view the full minutes text for item 117.