Resolved
That, subject to the signing of a legal agreement, regarding the education contribution (previously agreed) and delegation back to officers for formal receipt of the agreed highways plan and appraisal of the amended tree protection measures, Planning Permission be granted, subject to the following conditions, as set out in the case officer’s report, as amended and renumbered: 1. Time limit. 2. Amended plans list. 3. Details of internal carriageway and connection to existing highway – roads to be built to adoptable standards. 4. Details of any requirements to re-profile or cut the existing embankment. 5. Off-site highway works – improvement/relocation of existing bus stop facility at Regent Caravan Park/inclusion of ghost island vehicular right turn and pedestrian refuge. 6. Protection of visibility splays. 7. Parking provision to be provided before occupation. 8. Scheme for parking management (investigation of TROs or alternative management). 9. Construction management plan. 10. Materials and samples to be agreed. 11. Precise details of windows/doors and their frames; dormer detail and porch canopies. 12. Boundary details to be implemented but acoustic barrier details provided and agreed beforehand. 13. Development to be carried out in accordance with the flood risk assessment. 14. Finished floor levels to be provided. 15. Surface water can drain to public sewer at restricted rate - precise details of surface water and foul water to be agreed. 16. Noise mitigation – precise details to be provided by condition and implemented before occupation (based on submitted noise assessment and additional supporting information), including glazing and vent requirements. 17. Tree protection – to be delegated back. 18. In accordance with arboricultural impact assessment and arboricultural method statement. 19. Landscaping scheme to be implemented. 20. Landscape maintenance – to be delegated back to deal with tree-related matters. 21. Standard EH13 contaminated land condition. 22. Standard EH14 contaminated land condition. 23. Ecological mitigation condition confirmed and shall be set out as per the original report. 24. Removal of domestic Permitted Development rights and solar panels. And subject to the following additional conditions (suitably worded): 25. Standard EH13 contaminated land condition. 26. Standard EH14 contaminated land condition. 27. Wheel washing condition (prior to commencement of site activity).