That Planning Permission be granted (with subsequent referral of the decision to Natural England) subject to a legal agreement to secure: · Financial contribution towards the continuing maintenance and improvement of the Middleton Wood BHS And the following conditions, as set out in the case officer’s report: 1. Standard 3 year timescale. 2. Development in accordance with approved plans. 3. Notwithstanding plans, all materials (including finishes and colours) to be agreed. 4. Notwithstanding plans, all boundary and surface treatments (including finishes and colours) to be agreed. 5. Access, parking and turning facilities – loading/unloading within the on-site facilities provided only. 6. Construction traffic management statement. 7. Separate drainage system. 8. Surface water drainage system and maintenance. 9. Hours of construction (Monday to Saturday 0800-1800). 10. Method statement for the electricity cable easement. 11. Construction method statement including dust control and barrier fencing to protect surrounding habitat. 12. Japanese knotweed and Montbretia management scheme. 13. Ecological mitigation and compensatory measures. 14. Construction environmental management plan. 15. External lighting details. 16. Landscaping scheme. 17. Noise rating levels not to be exceeded at nearby identified receptors. 18. Contamination. 19. No external storage. 20. No building or planting of deep rooted shrubs/trees within 3 m of the public sewer.
Word for word from the decision Lancaster published for this meeting.Source: committeeadmin.lancaster.gov.uk
Middleton Clean Energy Plant Erection of a 47.5mw gas fired power station and Middleton Road associated works Middleton Lancashire
Name of Applicant Name of Agent
[name removed] -
Decision Target Date Reason For Delay
20 January 2015 To resolve issues relating to noise, air quality and contamination
Case Officer [name removed] Yes
Approval (subject to a referral back to Chief Officer to Summary of Recommendation allow notice to be served on Natural England)
(i) Procedural Note
This application was presented to Planning Committee on 8 December 2014. Members resolved to delegate the application back to the Chief Officer to determine unless there were outstanding items or the Chief Officer was seeking to approve the application against a consultee’s objection, in which case the application was to be reported back to January’s Committee. As there were 3 outstanding items the application was reported back to Planning Committee on 5 January 2015. On that date only 1 of the 3 outstanding items (contamination) had been resolved, so the application was deferred until such time as all matters were adequately addressed. It is being reported back to Planning Committee as per January’s resolution as the remaining 2 outstanding items (noise and air quality) have now been assessed to the relevant consultee’s satisfaction.
1.0The Site and its Surroundings
1.1This full application relates to an area of land which is part of the former Middleton Oil Refinery and is known locally as Middleton Wood. The site area is 0.476 hectares and comprises of mainly rough ground covered by inert tipped material upon which some natural regenerated vegetation occurs in parts.
1.2Part of the site comprises existing hard surfaces forming an original portion of the road network within the refinery site.
1.3The site abuts existing industrial sites which front Middleton Road and there is potential linkage through that land by an existing access road on the other side of the boundary. Although the land forms part of the wider Middleton Wood site which is in the City Council’s ownership, it has until relatively recently continued to be used for the reclamation of inert construction material and hence has not regenerated into natural habitat in the same way that the wider site area has.
1.4The site and its surroundings are subject to a number of designations, including Hazardous Substance Installations designations (Tradebe Solvent Recovery); a Radon Protected Area; a Minerals Safeguarding Area and is an area identified as being susceptible to groundwater flooding. Heysham industrial Estate, a waste site allocation, lies further to the south. The wider site includes a Biological Heritage Site designation.
2.0The Proposal
2.1The development consists of a 14m high, 1300sq.m industrial building which is to be used as a power hall housing five reciprocating gas engines. Fuel will be supplied from an existing underground natural gas pipeline. Emissions from the engines will be vented from a 35m high flue stack.
2.2The proposal is in effect a small gas powered powers station designed to provide on demand additional capacity at tomes when wind power is delivering less and demand is high. It is generally constructed off site and assembled on the land once consent is granted.
2.3Approximately 18 permanent staff in combinations of shift workers would be employed by the site. Vehicular access to the site both during and after construction would be over the existing estate roads.
3.0Site History
3.1The following application is relevant:
Application Number Proposal Decision 95/01352/DPA Change of use from derelict Shell/ICI works to Middleton Granted 1/4/1996 Community Wood
4.0Consultation Responses
4.1The following responses have been received from statutory and non-statutory consultees:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.