Resolved
That Planning Permission be granted subject to the following conditions, as set out in the case officer’s report: 1. Standard 3 year time condition 2. In accordance with plans 3. Construction method statement including: a) a) The parking of vehicles of site operatives and visitors b) b) The loading and unloading of plant and materials c) c) The storage of plant and materials used in constructing the development d) d) The erection and maintenance of security hoarding e) e) Wheel washing facilities f) f) Measures to control the emission of dirt and dust during construction g) g) Details of working hours h) h) Contact details of the site manager. i) i ) Temporary highway signage and advanced warning signs at the proposed points of access to Oxcliffe Road alerting drivers to the likelihood of large slow moving vehicles j) j) Measures to control traffic on Oxcliffe Road including temporary signals k) k) Measures to control movements of vehicles between the site and Oxcliffe Road l) l) Measure to protect users of the public footpaths 4. Scheme for the widening of the site access to the compound and details of surfacing 5. No tree within the site or on any immediately adjacent property or land shall be cut-down, up-rooted, topped, lopped or destroyed, nor any hedge within the site cut-down or grubbed out, other than those identified within the approved application, without the prior written approval of the local planning authority and before any site activity is commenced in association with the development. 6. Planting scheme with 10 year maintenance 7. Arboricultural Method Statement & Tree/Hedge Protection Plan 8. Ecology mitigation during construction 9. A comprehensive and detailed Habitat Management Plan for the anticipated lifetime of the solar farm and include proposals for monitoring the ecology of the site to be used to update and develop the Management Plan as required. 10. Details of materials/finish for all new buildings/cabinets 11. Precise height, colour and finish of pole for CCTV 12. Details of all new hardstanding 13. All cabling underground 14. Reinstatement of land after 35 years in accordance with scheme to be submitted 15. If the solar panels fail to produce electricity for a continuous period of 12 months the panels and associated equipment shall be removed from the site and the land shall be reinstated ... view the full minutes text for item 27.