Resolved
That Planning Permission be granted subject to the signing of a legal agreement to deliver the abovementioned planning obligations and the following conditions, as set out in the case officer’s report, with amendments to condition no. 14: 1. Time Limit 2. Approved Drawings List 3. Construction method statement. It shall provide for: a. The parking of vehicles of site operatives and visitors. b. The loading and un-loading of plant and materials. c. The storage of plant and materials used during the construction period. d. The erection and maintenance of security hoarding. e. Wheel wash/road sweep facilities f. Surface water management during construction (to avoid contamination to ground water/beck) g. Noise & Vibration control (details of any pile driving including mitigation) 4. Hours of construction limits 5. Construction details of the vehicular and pedestrian access points from the site to Stoney Lane and the PROW to be agreed including programme for implementation. 6. Roads to be built to adoptable standards to base course level before construction of the dwellings unless otherwise agreed in writing in accordance with a phased programme for construction of the development 7. Scheme for the construction of off-site highway improvement works namely: · Creation of parking facilities(Plots 02 – 05) Stony Lane with footway along the frontage of the site tying into existing adjacent number 23 Stoney Lane. · Implementation of a range of off-site highway improvement works relevant to influencing vehicle speeds along Stoney Lane at its junction with the afore-mentioned development site. · Measures to prohibit vehicles parking within the adopted highway at the foot of the public right of way onto Chapel Street (TBC) 8. Protection of visibility splays 9. Parking provision 10. Garage use restriction 11. Details of cycle and refuge storage for properties without garages 12. Tree Protection condition (TBC) 13 Arboricultural Method Statement 14. Landscaping condition, including bank stabilisation works (TBC) 15. Boundary plan to be implemented and site/plot enclosures provided before occupation 16. Precise scheme for ecological mitigation to be agreed 17. Development to be carried out in accordance with Flood Risk Assessment (FRA) 18. Precise drainage scheme including details of implementation and management 19. Precise details of the public open space including play equipment and maintenance programme 20. Samples of all external materials and stonework/brickwork sample panel to be provided 21. Precise architectural detailing of windows/doors/mock chimneys/roof verges/eaves/any decking raised platforms. 22. Construction details and appearance of retaining walls/features within the site 23. Implementation of a programme of archaeological work in accordance with a written scheme first submitted to and agreed in writing by the Local Planning Authority. 24. Unforeseen contamination 25. Removal of PD rights for extensions/outbuildings/roof alterations