Resolved
RESOLVED (A): (Unanimous) That subject to a S106. legal agreement covering: a. Local Employment Issues b. Highway Issues; c. The creation of the access, re-instating of the footway and dropped crossing points should be secured by condition and a s278 agreement. d. Provision of signage from the site to the Station and bus stops e. Provision of Real Time Passenger Information (RTPI) to provide better, more reliable information about bus services. To provide a RTPI sign would require a contribution of approximately £15,000.00. f. Highway improvement works; g. Widening the Marshall Road two-lane approach; and h. Widening the entry width of the Lottbridge Drove (North) arm. i. Travel Plan surveys and monitoring reports should be secured through an s106 agreement. Then planning permission be granted subject to the following conditions: 1. The development hereby permitted shall be begun before the expiration of three years from the date of permission. 2. The development hereby permitted shall be carried out in accordance with the approved drawings; 4158-155 Tree Plan 4158-301 Rev P Proposed Site Plan 4158-306 proposed Elevations 4158-307 Unit 6 Proposed Elevations 4158-308 Shopfront Details G22765 0101 Rev P1 Proposed Drainage Layout 3. No development shall take place until samples of the materials (including colour of render, paintwork and colourwash) to be used in the construction of the external surfaces of that part of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. 4. The development hereby permitted shall only be carried out in accordance with the approved Flood Risk Assessment (FRA) (April 2018) and the following mitigation measures details within the FRA: a. All occupants will sign up to the Flood Warning Service, as stated in FRA sections 6.1 and 7. b. A flood preparation and evacuation plan is drawn up, as recommended in FRA Sections 6.2 and 7, for identification and provision of a safe route into and out of the site to an appropriate safe haven. c. Flood resilience and resistance measures are incorporated into the design, as advised in Section 6.3 of the FRA. The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing/phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the Local Planning Authority. 5. Prior to completion or first occupation of the development hereby approved, whichever is the sooner; details of treatment of all ... view the full minutes text for item 26.