Resolved
RESOLVED : ( Unanimous ) That permission be granted subject to the following conditions: 1. T he development hereby permitted shall be begun before the expiration of three years from the date of permission. 2. The proposed development shall be carried out in strict accordance with the following plans: 2018-16-02 – Proposed Ground and First Floor Plans 2018-16-03a - Proposed Second Floor and Roof Plans 2018-16-04 – Proposed Elevations 2018-16-05 – Patio Plan & Site Section 2018-16-06a – Patio Rear Sectional Elevation & Side Elevation 2018-16-07 – Wheel Wash Area Plan 2018-16-08 - Hard Surface Finishes 2018-16-09 - Existing and Proposed Block Plans 2018-16-10 – Proposed Foul Drainage 2018-16-11 – Service Intake & Tree Protection Plan 2018-16-12 – Proposed Street Scene Elevation 2018-16-13a – Site Layout and Section 2018-16-14 – Landscaping Plan 2018-16-15 – Existing and Proposed Front Boundary 2018-16-31 – Proposed Garage Plan & Elevations 3. The external facing materials shall be as submitted within the approved Materials Schedule unless agreed otherwise in writing by the Local Planning Authority; · Roof Tile: Forna Especial Spanish Natural Slate · Windows and Doors: Aluminium Framed double glazed Grey (RAL 7016) · External Walls: Smooth Render (Grey) · Eaves and Rainwater: Upvc Graphite Coloured 4. No demolition, site clearance or building operations shall take place except between the hours of 8.00 a.m. and 6.00 p.m. on Mondays to Fridays and 8.00 a.m. and 1.00 p.m. on Saturdays and that no works in connection with the development shall take place on Sundays or Bank/Public Holidays. 5. No works shall commence on site until the two street trees in Upper Carlisle Road either side of the proposed access are protected with timber hoarding and chestnut pale fencing in accordance with approved drawing 2018-16-11 . Such hoarding shall be inspected and approved by the Local Planning Authority before any works commence on site, and maintained during the course of the works on site. No unauthorised access or placement of soils, goods, fuels or chemicals or other material shall take place inside the fenced area. 6. All existing trees and shrubs (including the street trees) not scheduled for removal shall be fully safeguarded during the course of the site works and building operations in accordance with the local planning authorities Supplementary Planning Guidance and relevant British Standards (BS 5837: 2012). No work shall commence on site until all trees and shrubs to be protected are fenced with 2.4m minimum height heavy-duty hoardings securely mounted on scaffold poles, and the temporary chestnut paling is installed in accordance with approved drawing 2018-16-11. Such fencing shall be inspected and approved by the Local Planning Authority before any works commence on site, and maintained during the course of ... view the full minutes text for item 29.