: 1) That the purchase, installation and operation of photovoltaic technology be approved on the following buildings with the Council’s estate:- (a) Lockmeadow Market Hall – 50kw Array ( b ) Vinters Park Crematorium – 10kw and 4kw Array (c) Magnolia House – 24kw Array 2) That the purchase of renewably generated electricity from a third party at Maidstone House be approved; 3) That a budget of £125,000 to implement the recommendations be approved; 4) That delegated authority be given to the Commercial Projects Manager to spend the budget and enter into the appropriate contracts to implement the recommendations; 5) That delegated authority be given to the Commercial Projects Manager to obtain the necessary permissions and licences to implement the recommendations including the registration for Feed in Tariff; sale, export or purchase of electricity; and appropriate agreements with the District Network Operator; and to assign those permissions and licences as appropriate; 6) That the progression of the work towards entering into an assignable power purchase agreement with a generator of renewable energy be approved and the trial for Maidstone House and the Gateway be agreed.
Word for word from the decision Maidstone published for this meeting.Source: meetings.maidstone.gov.uk
This report has been commissioned at the request of [name removed] (Director) and [name removed] (Commercial Projects Manager) of Maidstone Borough Council to provide advice upon:
Quality Assessment of the Council Report dated 24 th June 2015.
This report is based on documents provided. Specifically:
The report itself LASER provided financial costs for energy
Not seen:
12 months of energy bills or spreadsheet data for each site
4 Page 1
Point 1:
Magnolia House
Given the relevant FIT thresholds sit between 10kWp and 50kWP, it might make sense on an this install to optimise this array up to a maximum 50kWp. Is this not possible due to roof space area available, then perhaps consider higher wattage panels?
Point 2:
How is the electricity generated at Magnolia House to be sold? At what rates and on what review frequency?
Point 3:
The figure of £125,000 is clarified in the breakdown set out in Point 2.7. The figure of £100,000 (jn point 2.7) if only for the 4 arrays at Market, Crematorium (2) and Magnolia looks both credible and reasonable based on current UK supply and installation rates for Tier 1 panels.
Point 5:
Establishing a G59/3 connection takes significantly longer than it ever did with certain Distribution Network Operators (DNOs) and the application process (no cost from the DNO) should be commenced at the Council’s earliest convenience with the relevant DNO (in this case UK Power Networks) if this has not already been carried out.
With so much distributed generation (DG) taking place across the South East of England, gaining access to capacity is no longer as straightforward as it once was.
We may be able to provide assistance with the process of completing the ENA forms if that is helpful.
1. Purpose or Report and Executive Summary
Point 1.2
Expectation of 62.83 tonnnes of carbon savings per annum looks to be appropriate. Given the tables provided in this report under 2.2, with array sizes of:
Market 50kWp with stated irradience levels of 1,081 Crematorium 10kWp and 4kWp with stated irradience levels of 1,111 and 1,023 respectively Magnolia 24kWp with stated irradience levels of 1,026
We would agree the anticipated annual kWh generation figures of 54,050kWh, 11,110kWh, 3,928.32kWh and 27,024kWh based on the irradiance figures provided to us. Together totalling 96,112kWh. The discrepancy between the CO2 reduction in 1.2 (62.83tn) and in the
5 second table (41.33tn) on page 2 is answered by the CO2 saving from Maidstone House and Gateway (21.5tn) if this were to be implemented under (for example) a PPA.
Point 1.4
Whilst the predicted contibution to the Council is stated at £19,402/annum, (£16,402 from second table plus c £3,000 from Maidstone House and Gateway), this does not include the energy savings as also stated in table 2 amounting to a futher £4,146 and arguably the £1,310 export for Magnolia House. Indeed this figure may be £8,812.93 (dependant on demand and generation…See table 2a below. Specifically, if the sites are consuming all of the electricity generated throughout the day, then the saving on energy that does not have to be purchased from the national grid is the cost of that energy now (£0.10859/kWh)
Table 2
It would be useful to have detail of the site’s energy use so as to establish the export likelihoods of the (3rd party owned) Magnolia House site as well as potential for export at the other sites.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.