LBC/MAL/16/00571 - The Wobin, 110 Mell Road, Tollesbury
ApprovedPlanning1 paper
North Western Area Planning Committee approved this item on Monday 5 September 2016. Below is the council's own wording, with the papers it was decided on.
RESOLVED that LISTED BUILDING CONSENT BE GRANTED subject to the following conditions: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2 The development hereby permitted shall be carried out in complete accordance with the approved drawings specifically referenced on this decision notice 3 All external joinery shall be in timber with a black painted finish and retained as such thereafter. 4 No works shall commence until a sample of the roof tiles for the boiler house/log store hereby approved have been submitted to and approved in writing by the local planning authority. The works shall be carried out in accordance with the details as approved and retained as such thereafter. 5 Prior to the replacement fireplace referenced as No. 2 on Drawing No. Wobbin /01/1 being installed, details shall be submitted to and approved in writing by the local planning authority. The works shall be carried out accordance with the details as approved and retained as such thereafter. Councillors [name removed] and A K M St. Joseph returned to the Council Chamber at this point in the meeting.
Word for word from the decision Maldon published for this meeting.Source: democracy.maldon.gov.uk
GRANT LISTED BUILDING CONSENT subject to the conditions as detailed in Section 8 of this report.
2. SITE MAP
Please see overleaf.
Agenda Item no. 11 Our Vision: Working in Partnership to make the Maldon District a better place to live, work and enjoy A genda Item no. 11 3. SUMMARY
3.1Proposal / brief overview, including any relevant background information
3.1.1 The site comprises a modest two storey detached dwelling set on a large and usual shaped plot of land to the western side of Mell Road and outside of the settlement boundary of Tollesbury. The property has a single storey projection to the eastern elevation and a distinctive tiled gambrel roof.
3.1.2 The dwelling is Grade II Listed and was once a pair of semi-detached labourer’s cottages. To the eastern end is a single storey pitched roof element which was once used as a brewhouse for the two former dwellings, whilst to the western end is a modern hipped roof garden room.
3.1.3 Listed Building consent is sought for the erection of an external boiler house and log store to the eastern end of the property with internal works in the location of the existing boiler and within other rooms. The works are summarized as follows: • External boiler cupboard and log store. The structure would be located to the eastern end of the property on the single storey brewhouse. It would be 2.8m wide, project 1m from the eastern side elevation and have an overall hipped roof height of 2.2m. The structure would comprise a brick plinth, timber weatherboard elevations and tiled roof. • Remove modern glazed tile surround to sitting room. • Remove non-loadbearing studwork partition that currently forms cupboard in dining room. • Create new opening in sitting room wall to allow direct access to external garden room. • Remove modern partition to existing middle bedroom and create a Bretton style bed.
3.2Conclusion
3.2.1 The works are considered acceptable in terms of the impact on the historic fabric and the setting of this listed building and would not result in significant harm to either of these elements. The works have been supported by both the Council’s Conservation Officer and the Parish Council and are in accordance with the aims of the National Planning Policy Framework (NPPF) and adopted and emerging policies and subject to relevant conditions regarding submission of material and final treatment of the internal fireplace is considered acceptable in this instance.
4. MAIN RELEVANT POLCIES
Members’ attention is drawn to the list of background papers attached to the agenda.
4.1National Planning Policy Framework 2012 including paragraphs: • 14, 49 and 59
Agenda Item no. 11 4.2 Maldon District Replacement Local Plan 2005 – Saved Policies: • S2 - Development outside Development Boundaries • BE1 - Design of New Development and Landscaping • BE16 - Extensions, Alterations to and Additional Buildings in the Curtilage of Listed Buildings
4.3Maldon District Local Development Plan submitted to the Secretary of State for Examination-in-Public on 25 April 2014: • D1 - Design Quality and Built Environment • D3 - Conservation and Heritage Assets
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.