RESOLVED that the application be APPROVED subject to all conditions as discussed: 1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2 The development hereby permitted shall be carried out in accordance with the following approved plans and documents: 2285-01 rev.B 2285-02 rev.C 2285-BP1 rev.A 2285-06 rev.A 2285-04 2285-05 2285-07 rev.A 2285-03 Lighting report Specifications for cover. 3 The materials used shall be as set out within the application form/plans hereby approved. 4 No form of external illumination shall be provided other than in accordance with the details hereby approved (including the luminance and spread of light; and the design, position and specification of the light fittings). The external illumination shall be retained in accordance with the approved details. 5 The existing and additional court hereby permitted shall only be used between 08:00 hours and 22:00 hours on Mondays to Fridays and between 08:00 hours and 20:00 hours on Saturdays, Sundays and Public Holidays. 6. The sides of the all-weather cover to the existing padel courts hereby approved shall not be partially or wholly infilled or enclosed .
Word for word from the decision Maldon published for this meeting.Source: democracy.maldon.gov.uk
APPROVE subject to the conditions (as detailed in Section 8 of this report).
2. SITE MAP
Please see below.
Our Vision: Sustainable Council – Prosperous Future 3. SUMMARY
3.1Proposal / brief overview, including any relevant background information
3.1.1 The application site is located within the grounds of the Park Drive Fitness and Squash Club on the north-eastern side of Park Drive. To the north-west and north- east is Promenade Park with a group of portacabins located immediately to the north- east of the site. To the east is the Council’s recycling centre and associated accessway. Beyond the accessway is the Blackwater Leisure Centre. On the opposite side of Park Drive are residential properties.
3.1.2 The site lies within the Leisure Quarter as identified in the Maldon and Heybridge Central Area Masterplan. Although Promenade Park is not a nationally Registered Park and Garden, it is identified in the Local Development Plan (LDP) as a local Historic Park and Garden and is, therefore, a non-designated local heritage asset.
3.1.3 Planning permission is sought for an all-weather cover to the three, existing padel courts, a new show court and a building to accommodate an office / changing area.
3.1.4 The building proposed would measure 7.4m x 4.8m with a mono-pitched roof with a maximum height of 2.9m. The building would accommodate an office/reception, two changing rooms, two toilets and a store. The external walls of the building would be finished in cedar cladding.
3.1.5 The new court would be open air, measure 20m x 10m and be located around 11m to the south-east of the three existing courts. The fencing/means of enclosure around the court would be up to 4m in height and consist of a mixture of glass panels and green coloured mesh fencing which would match the existing courts. The court would be illuminated by lights mounted on four columns, 6m in height (the same as the existing courts).
3.1.6 The all-weather cover would measure 22m x 33m and would be attached to posts 6.3m in height. The roof itself would be a maximum of 3.7m in height (a maximum of 10m from ground level). The roof would be curved in shape with ‘gabled’ ends. A specification for the cover has been provided. The roof would be finished in heavy duty PVC coated fabric membrane, off-white in colour.
3.1.7 It is stated that the parking provision on site would remain unchanged and is stated as being 80no. parking spaces, 2no. light goods vehicles/public carrier vehicles parking spaces, 6no. motorcycle spaces and 6no. cycle spaces. These spaces are shared with the adjacent leisure centre.
3.1.8 The number of people employed would remain unchanged at five full-time employees. The hours of use are proposed as 08:00 to 22:00 every day.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Appointment of Vice-ChairpersonRESOLVED that Councillor A M Lay be elected Vice-Chairperson of the Central Area Planning Committee for the Municipal...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.