Maldon District Council
North Western Area Planning Committee, Wednesday 3 December 2025 at 7.30pm

24/00919/FUL - Barn A At, The Barn, Braxted Park Rd, Colchester, CO5 0QB

Approved Planning 2 papers

AI summaryMaldon District Council's North Western Area Planning Committee has approved the demolition of two agricultural barns at Braxted Park Road and their replacement with four new dwellings, two two-bed and two three-bed.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedSubject to 13 planning conditions
Money£169.45 per dwelling RAMSAlready paid for one dwelling; no further required
What happens nextBegin within three yearsStandard time limit condition applies
Who it affectsBraxted Park Road, ColchesterTwo agricultural barns to be demolished and rebuilt

What was decided

The application was approved, allowing demolition of the two existing agricultural barns and construction of four replacement dwellings, with the design identical to the prior approval conversion scheme. Report P10, P11, P12, P13

Members accepted the prior approval fallback as a material consideration of significant weight, meaning the principle of a residential use at the site was already established. Report P40, P41, P42

The approval was granted despite the site being outside any defined settlement boundary in the open countryside, relying on the council's inability to demonstrate a five-year housing land supply. Report P16, P32, P34

Why

The council can currently only demonstrate 2.7 years of housing land supply, triggering the presumption in favour of sustainable development under paragraph 11d of the NPPF. Report P32, P34

A prior approval granted in April 2024 for conversion of the barns to four dwellings exists and is a realistic fallback, meaning the proposed new build would not cause materially greater harm than the conversion scheme. Report P10, P40, P41, P42

Officers concluded the development would not harm residential amenity, highway safety, ecology or the character of the area, as the design, scale and massing are identical to the approved prior approval scheme. Report P18, P60, P64, P71

What happens next

Development must begin within three years of the permission date, with surface water and foul drainage details to be agreed before any works above ground level. Report P126, P129, P132

Before first occupation, the existing vehicular access must be formalised, cycle parking provided, and Residential Travel Information Packs distributed to occupiers. Report P133, P135, P136

A Biodiversity Enhancement Strategy and a lighting design scheme for biodiversity must be submitted and approved before works above slab level and before installation of any external lighting. Report P138, P139, P141

The money

  • £169.45 Essex Coast RAMS tariff per new dwelling, already paid for the dwelling permitted under the prior approval scheme Report P96

Options considered

  • Chosen: Approve the application as recommended by officers. Prior approval fallback of significant weight, no demonstrated five-year housing land supply, and design identical to approved conversion scheme Report P1, P16, P40, P42
  • Rejected: Refuse the application as recommended by Great Braxted Parish Council. Officers found no heritage concerns, no highways objection, and design identical to the prior approval scheme already accepted Report P108, P109, P110, P111, P112, P113, P114, P115, P116

Implications

  • Legal: The site is outside any defined settlement boundary, meaning the development is a departure from the Maldon District Local Development Plan, justified under the tilted balance of NPPF paragraph 11d. Report P16, P32, P34
  • Equalities: The two two-bed dwellings and two three-bed dwellings align with the Local Housing Needs Assessment finding that 35% of need is for two-bed and 35% for three-bed market homes. Report P51, P53
  • Climate: A condition requires surface water drainage to manage 1 in 100 year events plus 40% climate change allowance, with runoff restricted to greenfield rates. Report P129
  • Risk: Permitted development rights for extensions, alterations and outbuildings under Schedule 2, Part 1, Classes A to H are removed by condition to retain council control over future changes. Report P142
  • Other: Biodiversity Net Gain requirements do not apply as the area of habitat land affected is below 25 square metres. Report P98

Who and where

  • The applicant, owner of the site and adjacent The Barn Report P7, P63
  • Neighbouring residents at The Barn, Lee Moor and Fair View Report P7, P63
  • Great Braxted Parish Council, which objected to the application Report P108
  • Essex County Council Highways, which raised no objection subject to conditions Report P71, P118
  • Future occupiers of the four new dwellings Report P44, P53

Timeline

  • 14 August 2025: Newspaper advertisement published in the Maldon and Burnham Standard Report P122
  • 20 August 2025: Site notice posted advertising the application Report P121
  • 10 September 2025: Expiry date for site notice comments Report P121
  • 3 December 2025: North Western Area Planning Committee considered and approved the application Report P1

Plain English for the jargon

  • Prior approval: A permitted development right allowing certain conversions, such as agricultural buildings to dwellings under Class Q, subject to the local planning authority's prior approval of specified matters.
  • Tilted balance: The presumption in favour of sustainable development in NPPF paragraph 11d, applied when a local planning authority cannot demonstrate an up-to-date five-year housing land supply.
  • Fallback position: An alternative scheme with extant permission that could be carried out if the current application is refused, which can be given significant weight in planning decisions.
  • RAMS: Essex Coast Recreational Disturbance Avoidance and Mitigation Strategy, requiring developer contributions to mitigate recreational impacts on European designated coastal sites.
  • Biodiversity Net Gain: A requirement that development delivers a measurable net improvement for biodiversity, not applicable here as the habitat area affected is below 25 square metres.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item368

Resolved

RESOLVED that the application be APPROVED subject to the following conditions: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2 The development hereby permitted shall be carried out in accordance with the approved plans stated on the Decision Notice. 3 The materials used in the construction of the development hereby approved shall be as set out within the application form/approved plans and Design and Access Statement. 4 No development works above ground level shall occur until details of the surface water drainage scheme to serve the development shall be submitted to and agreed in writing by the Local Planning Authority. The agreed scheme shall be implemented prior to the first occupation of the development. The scheme shall ensure that for a minimum: 1) The development should be able to manage water on site for 1 in 100 year events plus 40% climate change allowance. 2) Run-off from a greenfield site for all storm events that have a 100% chance of occurring each year (1 in 1 year event) inclusive of climate change should be no higher than 10/ls and no lower than 1/ls. The rate should be restricted to the 1 in 1 greenfield rate or equivalent greenfield rates with long term storage minimum rate 1l/s) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) You are advised that in order to satisfy the soakaway condition the following details will be required: details of the area to be drained, infiltration rate (as determined by BRE Digest 365), proposed length, width and depth of soakaway, groundwater level and whether it will be rubble filled. Where the Local Planning Authority accepts discharge to an adopted sewer network you will be required to provide written confirmation from the statutory undertaker that the discharge will be accepted. 5 No development works above ground level shall occur until ... view the full minutes text for item 368.
Word for word from the decision Maldon published for this meeting. Source: democracy.maldon.gov.uk

Follow this further

Built from Maldon's papers

What the report saysPro

Report to North Western Area Planning Committee

Recommendation

APPROVE subject to the conditions (as detailed in Section 8 of this report)

2. SITE MAP

Please see below.

Our Vision: Where Quality of Life Matters 3. SUMMARY

3.1Proposal / brief overview, including any relevant background information

Site Description

3.1.1 The application site is located to the south of Braxted Park Road. The application site is occupied by two agricultural buildings which were previously used for the storage of farming equipment and does not fall within any defined settlement boundary. The site is within a rural location, with residential properties to the east of the application site at The Barn (within the same ownership as the Applicant) and to the west at Lee Moor and Fair View.

3.1.2 The property is not listed, nor located within a conservation area.

The Proposal

3.1.3 Planning permission is sought for the demolition of two existing agricultural barns and erection of replacement buildings to provide a total of four new dwellings. The application is submitted pursuant to the previous grant of prior approval in April 2024 for the conversion of the existing barn to residential use (application ref 24/00072/PACUAR).

3.1.4 Having undertaken further review of the prior approval conversion scheme in advance of carrying out the associated works, the applicant now wishes to demolish and rebuild the barns, to allow for improved insulation of the resulting structures and overall build quality of the end product. The overall appearance of the replacement barns within which the dwellings are created would be identical to that of the prior approval scheme.

3.1.5 The proposed pair of two-bedroom dwellings would be contained within a new building to replace the barn closest to Braxted Park Road (plot one). The design of the building would be identical to that of the prior approval scheme – which proposed a number of alterations to the existing barn (demolition of the covered area to the western side elevation, installation of two large glazed panels to the southern elevation, the addition of four openings to the western and eastern elevation, and the addition of two doors to the northern elevation).

3.1.6 The proposed pair of three-bedroom dwellings would be contained within a new building to replace the barn to the southern side of the site (plot two). Again, the design of the building would be identical to that of the prior approval scheme, which proposed a number of alterations to the existing barn (demolition of the southern single storey projection, the addition of a large glazed panel and two windows to the northern and southern elevations, the addition of four openings on the western elevation and six on the eastern elevation).

3.1.7 The block plan shows that amenity space would be provided to the rear of each dwelling. Each dwelling would be allocated two parking spaces within a shared parking area to the western side of the site. Additional soft landscaping enhancements are proposed to the front of the site as indicated by the submitted Landscape and Ecological Enhancement Plan.

Conclusion

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
24/00919/FUL: Barn A At, The Barn, Braxted Park Rd, Colchester, CO5 0QBReport 457 KB DownloadRead as text
PDF
Members' UpdateReport 94 KB Download

At this meeting

Whole meeting

Who was there

3 of 9 attended
MF
Councillor Mark F L Durham CCChairperson, present
ME
Councillor Maddie E ThompsonVice-Chairperson, apologies
JC
Councillor Jade C HughesCommittee Member, apologies
SJ
Councillor Simon J N MorganCommittee Member, absent
CP
Councillor Clive P MorleyCommittee Member, present
RH
Councillor Richard H SiddallCommittee Member, absent
EL
Councillor Emma L StephensCommittee Member, present
SW
Councillor Sue WhiteCommittee Member, apologies
LL
Councillor Lisa L WiffenCommittee Member, apologies

On this subject at Maldon

Search all
  1. 24/00919/FUL - Barn A At, The Barn, Braxted Park Rd, Colchester, CO5 0QBThis decision
  2. 25/00590/FUL - Agricultural Barn at Loddarts Farm, Lodge Road, Woodham MortimerApproved
  3. 25/00545/FUL, Barn At Rosemary Cottage, Barnhall Road, Tolleshunt KnightApproved
  4. 22/00439/FUL - Land Rear of Hill Barn, Rectory Lane, Woodham MortimerNoted
  5. 22/00443/FUL - Land Rear of Hill Barn, Rectory Lane, Woodham MortimerDecided
  6. 22/00414/FUL - Jechs Barn, Crouchmans Farm Road, Ulting, Essex, CM9 6QTAgreed

More from Maldon North Western Area Planning Committee

All decisions
MeetingDecisionOutcome
9 Sep 2026 Minutes of the last meetingRESOLVED that the Minutes of the meeting of the Committee held on 12 August 2026 be approved and confirmed. Approved Open
9 Sep 2026 26/00157/FUL Caravan At Toad Hall, Station Road, Cold NortonRESOLVED that the application be APPROVED subject to the following conditions: 1 The development hereby permitted sha... Approved Open
9 Sep 2026 25/00421/FULM Rosedale, Lea Lane, Great Braxted, Witham, Essex, CM8 3ERRESOLVED (i) that the application be APPROVED and authority be delegated to the Director of Place, Planning and Growt... Approved Open
12 Aug 2026 Minutes of the last meetingRESOLVED that the Minutes of the meeting of the Committee held on 15 July 2026 be approved and confirmed. Approved Open
12 Aug 2026 25/00972/FUL Agricultural Building at Oak Nursery, Hackmans Lane, PurleighRESOLVED that the application be APPROVED subject to the following conditions: 1. The development hereby permitted sh... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies