RESOLVED that this application be APPROVED subject to the following conditions: 1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2. The development hereby permitted shall be carried out in complete accordance with the approved drawings specifically referenced on this decision notice. · 19507_763_01 · 19507_763_03 · 19507_763_05 REV.C · 19507_763_06 REV.B · 19507_763_50 REV.D · 19507_763_300 REV.D 3. The external surfaces and fenestration of the development hereby approved shall be constructed of materials and finish as detailed within the application form and retained as such thereafter. 4. The measures for securing the resilience of the development against the effects of a flood event contained within the flood resilience and resistance statement which was submitted as part of the planning application and forms part of this permission, shall be fully implemented and put in place prior to the first use of the development and retained as such thereafter. 5. No development shall take place, including any ground works or demolition, until a construction management plan has been submitted to, and approved in writing by, the local planning authority. ... view the full minutes text for item 177.
Word for word from the decision Maldon published for this meeting.Source: democracy.maldon.gov.uk
APPROVE subject to the conditions (as detailed in Section 8 of this report).
2. SITE MAP
Please see below.
Our Vision: Sustainable Council – Prosperous Future 3. SUMMARY
3.1Proposal / brief overview, including any relevant background information
Site description
3.1.1 The application site lies within the settlement boundary of Maldon, located within the Blackwater Retail Park and is occupied by a single-storey commercial building used as a Use Class A3 unit (McDonalds). The unit is situated approximately 100 metres away from a grade II listed building, Old Ironworks, opposite a supermarket, Tesco, with petrol station and adjacent to an office building, Trafalgar House.
Proposal
3.1.2 Planning permission is sought for the reconfiguration of the drive thru lane to provide a side-by-side order point, incorporating a new island for signage and two Customer Order Displays (CODs) with associated canopies, minor extensions to the existing presenter and booth windows. This proposal effectively represents an amendment to a previous application, reference 16/00315/FUL, which was approved at committee on 1 June 2016. That 2016 application has been implemented through the erection of the bin stores to the north of the site. Under this application, those bin stores are proposed to be cladded in timber. The side by side drive through arrangement has not been implemented, nor other ancillary associated works around the site.
3.1.3 The proposed CODs would have a maximum height of 3m and would measure 0.6m wide by 0.3m deep. The approximately triangular-shaped canopies above the CODs would have a maximum width of 2.4m and a maximum depth of 3.5m. The canopy would be made of glass reinforced plastic (GRP) and would stand on a steel structure.
3.1.4 The proposed extensions will be to existing cash and presenter booths by creating additional spaces in the form of a ‘bay’. The total area of the two bays amount to approximately 5sqm.
3.1.5 The extensions would be constructed of external materials to match those of the existing building. There are proposed alterations to the roof, to be finished in a green appearance.
3.1.6 The applicants have amended the scheme since the submission of the scheme. The layout of the drive through under this application had been amended from the original approval, however, that layout would have resulted in the loss of a single parking space. Essex County Council Highways(ECC) had raised concerns regarding the new layout to which the applicants have now reverted back to the approved layout under planning reference 16/00315/FU which also reinstates the single parking space.
3.1.7 In summary, the changes are as follows:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Appointment of Vice-ChairpersonRESOLVED that Councillor A M Lay be elected Vice-Chairperson of the Central Area Planning Committee for the Municipal...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.