Resolved
RESOLVED that the application be APPROVED subject to the following conditions: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2 The development herby permitted shall be carried out in accordance with the following approved plans: 21/23/01, 21/23/02, 21/23/03, 21/23/04, 21/23/05 and 21/23/07. 3 Prior to their use in the development hereby approved, details of the materials to be used in the construction of the external surfaces, including windows and doors, of the development hereby approved shall have been submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details and retained as such thereafter. 4 Within 3 months following the first occupation or connection to utility services, whichever is the sooner, of the dwelling hereby approved, the existing dwelling on the site shall be demolished and the resulting material removed from the site. 5 No development works above ground level shall occur until details of the surface water drainage scheme to serve the development shall be submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development. The scheme shall ensure that for a minimum: 1) The development should be able to manage water on site for 1 in 100 year events plus 40% climate change allowance. 2) Run-off from a greenfield site for all storm events that have a 100% chance of occurring each year (1 in 1 year event) inclusive of climate change should be no higher than 10/ls and no lower than 1/ls. The rate should be restricted to the 1 in 1 greenfield rate or equivalent greenfield rates with long term storage (minimum rate 1l/s) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) or 50% betterment of existing run ... view the full minutes text for item 351.