Resolved
82/2013 The Cabinet agreed the road and pavement programmes as set out in Appendices A and B to the report. Reasons: This decision will assist with the Council’s priority of ‘Everyone benefiting from regeneration’.
Cabinet agreed this item on Tuesday 16 April 2013. Below is the council's own wording, with the papers it was decided on.
Resolved
82/2013 The Cabinet agreed the road and pavement programmes as set out in Appendices A and B to the report. Reasons: This decision will assist with the Council’s priority of ‘Everyone benefiting from regeneration’.
This report provides a list of Road and Pavement Resurfacing Schemes for 2013/14.
It was agreed at Council on 21 February 2013, that a further £480,000 of funding would be put forward for Road and Pavement schemes. This reports identifies those additional schemes on which the funding will be spent.
1. Budget and Policy Framework
1.1The budget for these works has been agreed by Full Council, therefore the recommendations in this report are for Cabinet to decide.
1.2The decision is within the policy and budget framework and in line with the priority of ‘Everyone benefiting from regeneration’ as set out in the Council Plan 2013/2015.
2.1The Highways Department compile a list of Road and Pavement sites to be resurfaced on an annual basis. The list of sites is restricted by the available and allocated budget. The proposed sites for 2013/2014 are listed in Appendix A.
2.2It was agreed at Council on 21 February 2013 that a further £480,000 of funding would be put forward for additional Road and Pavement schemes. The proposed additional road and pavement sites are listed in Appendix B.
2.3Highways are also seeking to improve the figures for National Indicator 168 (Principal Roads where maintenance should be considered) and National Indicator 169 (Non-Principal classified roads where maintenance should be considered) against the newly approved targets of 6% and 13% respectively. 2.4 Each year the Highways Department receive information and requests from Members, Highway Inspectors, members of the public and other external sources detailing roads and pavements that require attention.
2.4.1 On an annual basis Medway Council undertake prescriptive road condition surveys as is required by Government to determine National Indicators (NI 168 and NI 169). The results from these very specialised inspections are also processed through a Carriageway Asset Management System (JCAM).
2.4.2 Each request is also considered and a visit is made to each site by an experienced Highways Engineer to undertake an objective assessment of the road and pavement condition and usage. The assessment takes into account all visual defects such as cracking, crazing and rutting together with those defects previously recorded by our road-surveying consultant.
2.4.3 Each of these sites is then given a priority assessment; a list of roads and pavements needing resurfacing is then drawn up. Cost estimates are prepared for each scheme and a cut off point added to show the extent of the approved budget.
2.4.4 The implementation of every proposed scheme is subject to weather conditions, statutory undertakers works, projects and other external influences and may therefore be delayed or postponed until resolved.
2.5Following approval of the schemes the programme of resurfacing works will be procured through the Highways Term Maintenance Contract with VolkerHighways.
3.1The additional list of Road and Pavements sites encompassed within the £480,000 funding as detailed below are split with approximately £250,382 on Road sites and £229,618 on Pavement sites. The options for Cabinet are to agree and approve the selected Road and Pavements sites on each list.
4. Advice and analysis
4.1Highways have invested in a system called J-CAM, (Jacobs Carriageway Asset Management) which takes the UK Pavement management System (UKPMS) data in CONFIRM (highways Asset management system) and enters that data into a model of the councils network, from this model we can predict what resources we need over the coming years to either maintain the network to a predetermined condition or conversely if we specify what resources will be spent on the asset, the model will predict the condition the network will be in over years, so that reliable informed decision making can take place.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Road and Pavement Resurfacing SchemesReport | 58 KB | DownloadRead as text |
Follow Cabinet at Medway and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 22 Sep 2026 | Articles on the Highway Policy132/2026 The Cabinet approved the final , set out at Appendix 3 to the report, for implementation and noted that futu... | Approved | Open |
| 22 Sep 2026 | Continuation of the Grow in Kent Visitor Economy and Inward Investment Service136/2026 The Cabinet approved the continuation of Medway Council participation in the Grow in Kent service. 137/2026 ... | Approved | Open |
| 22 Sep 2026 | Medium Term Financial Outlook 2026-2031The Cabinet noted the projected budget requirement, the Council’s resource assumptions, and the resultant projected b... | Noted | Open |
| 22 Sep 2026 | Private Sector Licensing (Additional & Selective Licensing Schemes)The Cabinet noted the outcome of the consultation process detailed in the Consultation Report (June 2026), which prov... | Noted | Open |
| 22 Sep 2026 | Procurement Strategy 2025-2030 Update ReportThe Cabinet noted the comments of the Business Support and Digital Overview and Scrutiny Committee, as set out in sec... | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.