RESOLVED that planning permission for this application be refused for the following reasons: 1. The proposed solar PV arrays would be installed on grade 3a agricultural land, classed as being the Best and Most Versatile. In the opinion of the Local Planning Authority the proposal would take the land out of arable production for the 25 year duration of the proposal and insufficient evidence has been provided to demonstrate that there is no other land of lesser agricultural quality which is available and suitable for the proposed installation. The applicant's submitted sequential analysis is insufficient for this purpose as it only considers sites within close proximity to the proposed grid connection point and not potential sites further afield. The Local Planning Authority cannot be satisfied that the development is directed to the most appropriate parcel of land. It is considered ... view the full minutes text for item 192.
Word for word from the decision Mid Devon published for this meeting.Source: democracy.middevon.gov.uk
This application seeks planning permission for the installation of a 5MW solar array on approximately 12.26 hectares of land forming part of Stoneshill Farm, Willand Road for a period of 25 years.
The site comprises a single field which has historically been used for growing crops. The land falls from east to west; the highest point of the site on the eastern boundary is at almost 75m AOD and the lowest point is on the western boundary at approximately 60m AOD.
To the east of the site lie the mainline railway and the M5 motorway, both of which run broadly north-south in two separate cuttings. To the south of the application site is the B3181 road between Willand and Cullompton, off which the site is proposed to be accessed.
The panels are proposed to be mounted on metal frames which have been pile driven into the ground and laid out horizontally with four panels per column. The panels are typically to be mounted 600mm from ground level at an angle of 20 degrees and have a typical maximum height above ground level of 2.27m.
Six inverters and six transformers are proposed to be located in pairs across the site. The inverter buildings are 0.96m wide x approximately 2.5m long. The transformer buildings are 2m wide x 4m long.
A single control room is proposed to be 5m long x 4.5m wide and have a height of 2.8m.
Western Power Distribution's substation building is proposed to be 5.2m long x 5.7m deep and have a mono-pitched roof of maximum height 4.35m. An additional smaller structure is attached to this building to provide a meter room and is 1.9m wide x 1.9m deep and has a mono-pitched roof of maximum height 3m. The building is to have brick external walls with a composite roof covering.
A 1.8m high weld mesh fence is proposed to surround the site with infrared CCTV cameras mounted a 2.1m high on a number of the fence posts.
A belt of orchard planting is proposed alongside the B3181 with a bank and hedge planted in front of the trees adjoining the road. New hedgerow planting is proposed along the eastern and western boundaries of the site, with other existing hedges either protected or infilled where gaps occur.
APPLICANT'S SUPPORTING INFORMATION
Planning Statement Phase 1 Ecology Survey Biodiversity Management Plan Flood Risk Assessment Landscape and Visual Impact Assessment Agricultural Land Classification assessment Geophysical Report Construction Traffic Management Plan
AGENDA 3 PLANNING HISTORY
14/01248/MFUL Change of use of land from agriculture to the installation and operation of a solar PV park to generate up to 5MW of power (site area 12.26 hectares) to include associated infrastructure - WITHDRAWN
DEVELOPMENT PLAN POLICIES
Mid Devon Core Strategy (Local Plan 1)
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.