Crematorium Abatement System

Agreed Committee 1 paper

Mansfield and District Crematorium Joint Committee agreed this item on Friday 23 February 2018. Below is the council's own wording, with the papers it was decided on.

Item8

Resolved

AGREED (unanimously) that: i ) the report be noted; and ii) the work be scheduled for 2019/20 to enable an order to be placed at the start of the new financial year to allow for manufacturing time and installation prior to 31 December 2019, in order to to ensure the Crematorium can legally carry out its functions. It was noted that from 1 January 2020 the Crematorium would no longer be able to purchase TMacs through CAMEO as all crematoria will be required to abate 100%.
Word for word from the decision Newark and Sherwood published for this meeting. Source: democracy.newark-sherwooddc.gov.uk

Follow this further

Built from Newark and Sherwood's papers

What the report saysPro

Report to Mansfield and District Crematorium Joint Committee

Summary

This report aims to highlight the issues surrounding the abatement equipment at the crematorium and provide options for the future.

Recommendations

(I) That the report be noted

(II) It is recommended to schedule the work for 2019/2020 for the order to be placed at the start of the new financial year to allow for manufacturing time and installation prior to 31.12.2019, to ensure that we can legally carry out our function. From 1 .1.2020 we will no longer be able to purchase TMacs through CAMEO as all crematoria will have to abate 100%.

Background

The purpose of this document is to outline the history of the equipment currently installed at Mansfield and District Crematorium and the associated operational issues. These observations are based on increased problems observed over 2016 to date and form the basis for recommendations for replacement/upgrade of various aspects of the installation with a view to improve the safety, efficiency and profitability of the facility as well as prepare the facility for future changes in legislation which may have an impact on the use of the equipment.

The current installation comprises of four FCC Joule cremators, two of which are serviced by one single line, fixed carbon bed type abatement system via a manual switchover system. A further two cremators are each serviced by a dedicated single line, fixed bed type abatement system.

The current installation at Mansfield and District Crematorium represents Best Available Technology (BAT) at the time of installation the existing equipment is described as below;

4 x FCC Joule Cremator

• Cremator 1 - CF454 FCC Standard width Joule Cremator Installed 1995 • Cremator 2 - CF485 FCC Standard width Joule Cremator Installed 1997 • Cremator 3 - CF521 FCC Standard width Joule Cremator Installed 1998 • Cremator 4 - MCF559 FCC Wide-body Joule Cremator Installed 2011

Cremators 1 is the oldest and it has always been the intention to remove this cremator from service by 2020 (The Oslo-Paris Commission (OSPAR) agreement on eliminating mercury emissions from crematoria, the UK agreed to reduce 50% mercury emissions from crematoria by 2012. But by 2020 all crematoria within the UK (roughly 240 facilities) will need to have a zero emissions rate. This means local councils and private organisations which run crematoria will need to either install entirely new cremation equipment, and/or integrate mercury abatement systems.)

The recommended design life of the cremators (20 years) albeit there is no indication of repetitive operational issues related to the cremators themselves as a result of age and effectively the cremators are a box with interchangeable parts so currently there is not a recommendation to look at replacing the other 2 smaller hearthed cremators. It should be borne in mind that natural evolution of the design of such equipment results in the fact that modern equipment is significantly more efficient and more compact. In turn it can be found to be more easily maintainable and user friendly.

Installation took place in 2010 of the abatement equipment and at this time, it was favourable to adopt the use of a fixed bed containing pelletised activated carbon in order to adsorb mercury from the gas stream. The primary benefit of a fixed bed is the large volume of carbon which has a long service period and requires no intervention from the operators.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Crematorium Abatement SystemReport 242 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

5 of 19 attended
ML
Councillor Mrs Lydia HurstCommittee Member, present
DP
Councillor David PayneCommittee Member, present
MS
Councillor Mrs Sheila SoarCommittee Member, apologies
TB
Tim BrownCommittee Member, apologies
MC
Councillor Mrs Cheryl ButlerCommittee Member, present
DD
Don DavisCommittee Member, apologies
EM
Executive Mayor Mrs Kate AllsopChairman, present
AT
Andrew TristramCommittee Member, present
RS
Roger SutcliffeCommittee Member, expected
SC
Sally CurtisOfficer, expected
MA
Mick AndrewsOfficer, expected
MS
Martyn SaxtonOfficer, expected

All 19 on the meeting page

More from Newark and Sherwood Mansfield and District Crematorium Joint Committee

All decisions
MeetingDecisionOutcome
23 Feb 2026 Operations ReportAGREED (with 6 votes for and 1 abstention) that: i) the committee approve the replacement of the existing crematorium... Agreed Open
23 Feb 2026 Financial Management Review April-December 2025AGREED (unanimously) that the financial information provided in Appendix 1 and Table 1 in the report be noted. Agreed Open
23 Feb 2026 Annual Review of Fees and Charges for 2026/27AGREED (unanimously) that: i) the proposed cremation fee as shown in Table 2 for the period 1 April 2026 to 31 March ... Agreed Open
23 Feb 2026 Revenue and Capital Budget 2026/27 - 2028/29AGREED (unanimously) that: i) the proposed revenue and capital budgets for 2026/27 be approved, as per Appendix 1; ii... Agreed Open
23 Feb 2026 Crematorium Development ReportAGREED (unanimously) that the Committee noted the report. Agreed Open