Provision of New Mercury Abatement Equipment

Agreed Committee 1 paper

Mansfield and District Crematorium Joint Committee agreed this item on Monday 7 September 2020. Below is the council's own wording, with the papers it was decided on.

Item1796

Resolved

AGREED (unanimously): i) To defer this report until full costings have been provided for consideration by the Committee.
Word for word from the decision Newark and Sherwood published for this meeting. Source: democracy.newark-sherwooddc.gov.uk

Follow this further

Built from Newark and Sherwood's papers

What the report saysPro

Report to Mansfield and District Crematorium Joint Committee

Summary

1.1This report provides an update to the Committee on the provision of the new Mercury Abatement Equipment (MAE).

Recommendations

To be resolved:

2.1That the current 2020/2021 capital budget of £627,000 for the provision of Mercury Abatement Equipment is increased by £191,460 to £818,460 to take into account the additional costs over and above the design and installation of the Equipment.

2.2That if necessary funds are transferred from General Reserves to the Capital Fund to make up the shortfall of £1,613.

3.0Background Information

3.1A budget quotation was received from Matthews Environmental Solutions (Matthews) in respect of the provision and installation of MAE and the removal of one cremator.

3.2Specifically, the quotation includes for:

a) The design, manufacture, delivery, installation and commissioning works for the removal of one of the existing standard sized cremator to include all necessary alterations, adaptation to control, monitoring equipment, flues etc.

b) The design, manufacture, delivery, installation and commissioning of mercury abatement plant to service three cremators and meet current emission levels, legislation etc. to include all necessary control, monitoring equipment, flues and the like.

c) A maintenance regime for new and existing equipment will form a separate contract from the expiry of the Defects Liability Period. Any maintenance within the DLP period is to be contained within the quotation.

3.3Matthews returned a quotation based on two options. The first option at £720,000 was for three single line systems. The second option instead of having three single line systems, allowed for one single line abatement system servicing one cremator (the newest cremator) with the other two cremators being serviced by a 2-into-1 system. This was costed at £627,000.

3.4A decision was taken to proceed with the second option as it was cheaper but also improved the system design and the resultant ease of use and maintenance. A subsequent Purchase Order was raised for £627,000 and issued to Matthews. 3.5 It is understood that the budget was set at £750,000 based on Matthews’ first option however this did not include builder’s accommodation works, an allowance for contingencies (which is standard practice) and Mansfield District Council’s Design Services fees. It is further understood that the 2019/2020 capital budget of £750,000 was requested to be carried forward into the 2020/2021 financial year but the recommendation was reduced to £627,000 to meet the value of the purchase order raised to Matthews. This now needs to be increased to include the costs shown below.

3.6The contract with Matthews for the value of £627,000 was entered into on 25 August 2020. We are now awaiting a timetable from them.

4.0Proposals

4.1The total estimated cost of the works is shown below:

Budget quote £627,000

10% contingencies £61,200

Builder’s accommodation works 15% £92,000

Design Services fees 5% £38,260

Total budget cost £818,460

4.2The final extent of accommodation works will be determined once the design work has been completed by Matthews however it will potentially include such items of work as:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Provision of New Mercury Abatement EquipmentReport 265 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

8 of 15 attended
DM
Councillor David MartinCommittee Member, present
TH
Councillor Tom HollisVice-Chair, present
MH
Councillor Mrs Helen-Ann SmithCommittee Member, present
MA
Mayor Andrew AbrahamsCommittee Member, present
AB
Councillor Andy BurginChairman, present
SR
Councillor Stuart RichardsonCommittee Member, present
ML
Councillor Mrs Lydia HurstCommittee Member, present
TS
Councillor Tom SmithCommittee Member, present
MG
Councillor Mrs Gill DawnCommittee Member, absent
EA
Eve AllsopOfficer, expected
LS
Lisa SimpsonOfficer, expected
CB
Craig BonarOfficer, expected

All 15 on the meeting page

On this subject at Newark and Sherwood

Search all
  1. Provision of New Mercury Abatement EquipmentThis decision
  2. Progress Report on the Provision of a Second Pitch at Newark R&M Cricket ClubAgreed
  3. Electric Vehicle Charging Provision in Newark and SherwoodAgreed

More from Newark and Sherwood Mansfield and District Crematorium Joint Committee

All decisions
MeetingDecisionOutcome
23 Feb 2026 Operations ReportAGREED (with 6 votes for and 1 abstention) that: i) the committee approve the replacement of the existing crematorium... Agreed Open
23 Feb 2026 Financial Management Review April-December 2025AGREED (unanimously) that the financial information provided in Appendix 1 and Table 1 in the report be noted. Agreed Open
23 Feb 2026 Annual Review of Fees and Charges for 2026/27AGREED (unanimously) that: i) the proposed cremation fee as shown in Table 2 for the period 1 April 2026 to 31 March ... Agreed Open
23 Feb 2026 Revenue and Capital Budget 2026/27 - 2028/29AGREED (unanimously) that: i) the proposed revenue and capital budgets for 2026/27 be approved, as per Appendix 1; ii... Agreed Open
23 Feb 2026 Crematorium Development ReportAGREED (unanimously) that the Committee noted the report. Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies