AGREED (with 7 votes For, 1 vote Against and 1 Abstention) that contrary to Officer recommendation planning permission be approved with the following conditions and reasons: Conditions: (i) three-year time limit for the development to take place; (ii) before commencement of works an archaeological survey be provided; and (iii) landscaping to screen the development, subject to consultation with the Conservation team, that this would not harm the character and/or setting of the listed building. Reason for approval: The public benefits would outweigh the harm to the setting of the Listed Building and character and appearance of the Conservation Area identified. In accordance with paragraph 13.5 of the Planning Protocol, as the motion was against Officer recommendation, a recorded vote was taken. Councillor Vote A Amer For C Brooks Absent L Dales Absent A Freeman Against P Harris Absent J Lee Absent K Melton Absent D Moore For E Oldham For P Rainbow For S Saddington For M Shakeshaft For M Spoors Abstention L Tift Absent T Wildgust For
Word for word from the decision Newark and Sherwood published for this meeting.Source: democracy.newark-sherwooddc.gov.uk
Business Manager Lead: Lisa Hughes – Planning Development
Lead Officer: Jamie Pegram, Planner, 01636 655326
Report Summary Application 23/00828/FUL Number
Proposal Installation of an outdoor Kazuba2 waterless toilet
Location Parish Church of All Saints, Front Street, Barnby In The Willows
Applicant [name removed]
23/00828/FUL | Installation of an outdoor Kazuba2 waterless toilet | Web Link Parish Church Of All Saints Front Street Barnby In The Willows (newark-sherwooddc.gov.uk) Target Date 28.08.2023 Registered 15.05.2023 Extension of Time 06.09.2023
That Planning Permission is REFUSED for the reason(s) detailed at Recommendation Section 10.0
This application is before the Planning Committee for determination, in accordance with the Council’s scheme of delegation as the officer’s recommendation is contrary to that of the Parish Council and because the application has been called in by Councillor Oldham on grounds that there is a clear need for the community and support from the community, eco- friendly design, and support for the viability of the church.
1.0The Site
The site relates to a Grade I listed church in Barnby-in-the-Willows and falls within the Conservation Area. The Parish Church is a 13th Century building which has 15th, 17th and 19th Century phases. The church is an important building within the context of the conservation area and forms a group with the old vicarage to the northwest, church cottage and Barnby Hall. The site is next to open fields and is used to access public footpaths south of the site. The site has the following constraints:
- Conservation Area - Within the grounds of a (Grade I) Listed Building - Public Right of Way through the Site - Flood Zone 1 and 2 (Proposal is proposed to be sited in an area of the site which falls within flood zone 1) - The site lies in an area of high archaeological potential.
2.0Relevant Planning History
14/02272/FUL Replacement of lead roof covering (Permitted 25.03.2015)
13/01397/FUL Erect a Broadband Signal Receiver Antenna to Church Roof (retrospective) (Permitted 08.08.2014)
3.0The Proposal
The application seek permission for the erection of a proposed self-contained toilet. The toilet is an ECO toilet and does not require plumbing to mains water and uses natural breeze and solar gain using a sewage tank to operate (as explained in more detail in the diagram below). Excavation in the form of an 850mm deep pit for the installation of the sewage tank below ground would be required. The self-contained unit would be of a contemporary design with a timber appearance with a metal door. The cubicle itself measures approximately 2.4m in height by 2.34m by 1.58m however when including the flue, the overall height would be 3.0m and the length would be 3.28m. The building would be clad with a black flue to the rear.
4.0Departure/Public Advertisement Procedure
Occupiers of 9 properties have been individually notified by letter. A site notice has been posted near the site and an advert has been displayed in the press.
Site Visit undertaken: 10.07.2023
5.0Planning Policy Framework
The Development Plan
Newark and Sherwood Amended Core Strategy DPD (adopted March 2019) Spatial Policy 8 - Protecting and Promoting Leisure and Community Facilities Core Policy 9 - Sustainable Design Core Policy 13 – Landscape Character Core Policy 14 – Historic Environment Core Policy 10 – Climate Change
Allocations & Development Management DPD (2013) DM5 – Design DM12 – Presumption in Favour of Sustainable Development DM9 – Protecting and Enhancing the Historic Environment DM4 - Renewable and Low Carbon Energy Generation
Other Material Planning Considerations
National Planning Policy Framework 2023 Planning Practice Guidance Householder Development Supplementary Planning Document 2014 Landscape Character Assessment Supplementary Planning Document 2013 6.0 Consultations
(a) Statutory Consultations
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.