AGREED (with 8 votes For, 1 vote Against and 1 Abstentions) that Planning Permission be approved subject to the following: (a) the completion of a S106 Agreement to secure, maintain and monitor Biodiversity Net Gain, a highway condition survey and works and bus stop mitigation; and (b) subject to the conditions contained within the report and as contained in the Schedule of Communication.
Word for word from the decision Newark and Sherwood published for this meeting.Source: democracy.newark-sherwooddc.gov.uk
Report to Planning Committee 5 December 2024 Business Manager Lead: Oliver Scott – Planning Development Lead Officer: Julia Lockwood, Senior Planner, [email removed]
Report Summary
Application No. 24/01261/FULM
Infrastructure associated with the connection of battery energy Proposal storage system to National Grid Staythorpe Electricity Substation and associated works. Land West Of Staythorpe Electricity Substation, Staythorpe Road Location Staythorpe Elements Green Applicant Agent - Staythorpe BESS Ltd https://publicaccess.newark-sherwooddc.gov.uk/online- Web Link applications/simpleSearchResults.do?action=firstPage
Registered 16.07.2024 Target Date 15.10.2024
That full planning permission be APPROVED subject to: a) The completion of a S106 Agreement to secure, maintain and Recommendation monitor Biodiversity Net Gain; and b) Subject to the conditions set out in Section 10 of the report.
This application was deferred at the Planning Committee meeting held on 11 November 2024, to allow the application to be considered after the completion of the consultation period and is being presented to the Planning Committee at the request of the Authorised Officer in line with the Council’s Scheme of Delegation.
1.0The Site
1.1The application site comprises approx. 5.20 hectares of mainly flat, agricultural land. Situated to the south-west of Staythorpe Electricity Substation and on the south- eastern side of Staythorpe Road, it is close to the main residential area of Staythorpe village, largely concentrated around Pingley Lane/Close to the north-west of the site.
1.2The red line of the application site is irregularly shaped as shown on the plan below. It includes the western corner of the existing National Grid substation and its existing II
access from Staythorpe Road, agricultural land, a large agricultural building, as well as an area of land that was included within the approved Battery Energy Storage System development (its main access and part of the transformer compound). The site also includes a number of drainage ditches, including a watercourse known as Staythorpe Sidings Drain which runs along the centre of the red lined site and is the responsibility of an Internal Drainage Board. This watercourse divides into two to the north and skirts around the two large blocks of woodland shown in green. There is also tree planting to the north-west of the sub-station access from Staythorpe Road.
Existing Site Plan showing the proposed red line boundary
1.3Many of the boundaries of the site are somewhat arbitrary and drawn to reflect positions of proposed development with planning permission, rather than features on the ground. The relationship with the layout of the adjacent approved BESS scheme is shown on the plan below for context. The north-west boundary of the application site along Staythorpe Road is defined by mature tree and hedgerow planting. In the centre of this boundary is an existing field access which sits adjacent to a layby which serves as a public bus stop. III
1.4In terms of Agricultural Land Classification, the majority of the site falls within Grade 3b which means it is of moderate quality and falls outside the definition of Best and Most Versatile agricultural land as defined by the National Planning Policy Framework. The plan below shows Grade 3b in light green and Grade 3a (good quality and within Best and Most Versatile) in dark green. There may be a small area within the red line of this application site that is Grade 3a, however, this land is also within the red line of the application already approved for the Battery Energy Storage System.
Agricultural Land Classification Plan IV
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.