Land At Newark Road, Wellow - 25/01862/PIP

Agreed Planning 1 paper

AI summaryNewark and Sherwood Planning Committee approved Permission in Principle for 2 to 9 dwellings on Newark Road, Wellow, by 8 votes to 4. Councillor T Smith left the meeting after the vote.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeAgreed8 votes For, 4 votes Against
MoneyCIL £0m2Housing High Zone 1, no CIL charge
What happens nextTechnical Details Consent within 3 yearsStage 2 application required
Who it affectsResidents near Newark Road, WellowOpen countryside edge of village site

What was decided

Permission in Principle was approved, with 8 votes for and 4 against.

Councillor T Smith left the meeting after the decision.

Why

The site is in the open countryside, but the council can only show a 3.43 year housing land supply, so the tilted balance under NPPF paragraph 11(d) is applied and additional weight is given to housing provision. Report 7.12, 7.13, 7.16, 7.27

Up to 1.31 hectares of Grade 2 (best and most versatile) agricultural land would be lost, but this is balanced against the small scale of the site and the housing supply shortfall. Report 7.22, 7.23

Between 2 and 9 dwellings on the 1.35 hectare site, at a maximum density of about 7 dwellings per hectare, is considered an acceptable scale of built form for the village. Report 7.24, 7.25

What happens next

A Technical Details Consent application must be submitted within 3 years of the decision, including site plans, elevations, a Preliminary Ecology Assessment, tree survey, contamination study and Biodiversity Net Gain details. Report 3.4, 9.4, P122, P124

The existing agricultural access off the A616 Newark Road would need upgrading, with junction improvements required for any scheme of more than 5 dwellings. Report 7.44, 7.46

A minimum 10% Biodiversity Net Gain must be delivered at the technical details stage, and a Phase 1 Contamination Survey will be required. Report 7.51, 7.54, P122

The money

  • £0m2 Community Infrastructure Levy rate for residential development in Housing High Zone 1 Report 7.55, P109

Options considered

  • Chosen: Approve Permission in Principle (as recommended). Tilted balance engaged due to 3.43 year housing land supply; provision of 2-9 dwellings given positive weight Report 9.2, 7.13, 7.27
  • Rejected: Refuse Permission in Principle. No impacts at principle stage would significantly and demonstrably outweigh the benefits of housing provision Report 7.27

Implications

  • Legal: The Planning Committee is the appropriate body to decide; a Legal Advisor was present at the meeting. Section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990 applies due to proximity to Wellow Conservation Area. Report 8.2, P115, 7.29, 7.30
  • Other: 18 public representations were received: 17 objections and 1 in support, raising concerns on highways, flooding, character, loss of wildlife and lack of need. Report 6.4, P39
  • Other: Wellow Parish Council objected on road safety, increased flood risk, loss of wildlife, isolated site and being out of character with the village. Report P37, 6.3
  • Other: NCC Highways raised concerns about 85th percentile speeds of 40.7 mph on the A616 and three recorded personal injury collisions near the site, requiring access upgrades. Report P36
  • Other: Mandatory 10% Biodiversity Net Gain applies, but is not within the scope of the Permission in Principle itself; it will be dealt with at technical details stage. Report 7.56, P125
  • Financial: No Community Infrastructure Levy charge applies as the site is in Housing High Zone 1 at a rate of £0m2. Report 7.55, P109

Who and where

  • Wellow Parish Council, which objected to the application Report P37, 6.3
  • Occupiers of 6 neighbouring properties notified by letter Report 4.1
  • The applicant, Arwin Developments (Wellow) Report P3
  • Future residents of the proposed 2 to 9 dwellings Report 3.1, 7.24
  • The Bungalow, the closest dwelling immediately west of the site Report 7.41
  • Existing users of Wellow's local amenities, including the church, pubs and school Report 7.11

Timeline

  • 25.10.2025: Application registered Report P3
  • 07.11.2025: Site notice displayed near the site Report 4.2
  • 07.11.2025: Officer site visit undertaken Report 4.3
  • 29.11.2025: Target determination date Report P3
  • 15.01.2026: Planning Committee decision to approve Permission in Principle
  • Within 3 years of the decision: Deadline for submission of Technical Details Consent application Report 3.4, P124
  • 16.01.2026: Extension of time agreed Report P3

Plain English for the jargon

  • Permission in Principle (PIP): First of a two-stage planning process that assesses only the location, land use and amount of development.
  • Technical Details Consent (TDC): Second stage application that assesses detailed design, access, layout and other matters, required within 3 years of any PIP approval.
  • Tilted balance: Planning presumption in favour of sustainable development applied through NPPF paragraph 11(d) where a council cannot show a 5-year housing land supply.
  • Community Infrastructure Levy (CIL): A charge on new development to fund infrastructure; in Housing High Zone 1 of Newark and Sherwood, residential CIL is £0m2.
  • Biodiversity Net Gain (BNG): Mandatory requirement since February 2024 for development to deliver at least a 10% measurable improvement in biodiversity compared with the pre-development baseline.
  • SHELAA: Strategic Housing and Economic Land Availability Assessment, used to identify potential development sites.
  • DPD: Development Plan Document, a statutory planning policy document forming part of the local development framework.
  • NPPF: National Planning Policy Framework, the government's national planning policy document.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item90

Resolved

AGREED (with 8 votes For and 4 votes Against) that Permission in Principle is approved, as contained within the report. Councillor T Smith left the meeting at this point.
Word for word from the decision Newark and Sherwood published for this meeting. Source: democracy.newark-sherwooddc.gov.uk

Follow this further

Built from Newark and Sherwood's papers

What the report saysPro

Report to Planning Committee

Report to Planning Committee 15 January 2026 Business Manager Lead: Oliver Scott – Planning Development Officer: Harry White - Planner/Conservation Planner

Report Summary

Application Number 25/01862/PIP Application for permission in principle for construction of a minimum of 2 Proposal dwellings and a maximum of 9 dwellings Land At Location Newark Road Wellow 25/01862/PIP | Application for permission in principle for construction of a Web Link minimum of 2 dwellings and a maximum of 9 dwellings | Land At Newark Road Wellow Arwin Developments (Wellow) IBA Planning Ltd - [name removed] Ltd Baseley Target Date 29.11.2025 Registered 25.10.2025 Extension of Time: 16.01.2026 Recommendation That Permission in Principle is Approved

This application is being referred to the Planning Committee for determination as the application represents a departure from the plan.

1.0The Site

1.1The site relates to an agricultural field, used for grazing, to the east of the village of Wellow. The field sits to the south of the A616 (Newark Road) and is bound to the east and west by woodland, and to the east by agricultural land and a bungalow. The field boundaries are post-1845 mixed hedgerows and wire fencing. Opposite the site entrance, to the north of the A616, are a number of bungalows forming ribbon development along the Newark Road. The woodland to the south of the site became established at the end of the 20th century.

1.2The site is not within a Conservation Area and there are no listed buildings nearby, however, the site is roughly 100-130m to the east of the Wellow Conservation Area Boundary, which is constrained by the Gorge Dyke in this direction. There are no known heritage constraints to the site.

1.3The site is within Flood Zone 1 and at low risk of surface water flooding except from the field dyke which separates the application site from The Bungalow to the west of the site, which is at 1 in 30 year surface water risk.

1.4The site has also been put forward through the SHELAA 2025.

2.0Relevant Planning History

None relevant.

3.0The Proposal

3.1The application seeks Permission in Principle (the first of a 2-stage process) for residential development of 2 to 9 dwellings. No specific details are required at this stage, though a feasibility layout has been provided, and shown below:

3.23.3 Permission in Principle requires only the location, the land use, and the amount of development to be assessed. If the proposal is for residential development (as is the case in this application), the description must specify the minimum and maximum number of dwellings proposed.

3.4It is the second stage of the process, Technical Details Consent, which assesses the details of the proposal. This must be submitted within 3 years of the Permission in Principle approval.

3.5It is understood that the proposed dwellings would use the existing access off Newark Road, the main road through the village. As the proposal is for permission in principle, no definitive elevational details or plans have been submitted at this stage – details would be considered at the Technical Details Consent stage if permission in principle is approved.

3.6Documents assessed in this appraisal:

• Application Form • Covering • Site Location Plan • Feasibility Layout Plan o All received 30th October • Visibility Splays o Received 4th December

4.0Departure/Public Advertisement Procedure

4.1Occupiers of 6 neighbouring properties have been notified by letter.

4.2A site notice was displayed near to the site on 7th November 2025.

4.3Site visit undertaken 7th November 2025.

5.0Planning Policy Framework

The Development Plan

5.1Newark and Sherwood Amended Core Strategy DPD (adopted March 2019)

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Land At Newark Road, Wellow: 25/01862/PIPReport 696 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 17 attended
AF
Councillor Andy FreemanChair, present
DM
Councillor David MooreVice-Chair, present
CB
Councillor Celia BrooksCommittee Member, present
LD
Councillor Linda DalesCommittee Member, present
SF
Councillor Simon FordeCommittee Member, apologies
PH
Councillor Peter HarrisCommittee Member, present
KM
Councillor Keith MeltonCommittee Member, apologies
PR
Councillor Penny RainbowCommittee Member, present
SS
Councillor Sue SaddingtonCommittee Member, present
MS
Councillor Maurice ShakeshaftCommittee Member, present
TS
Councillor Tom SmithCommittee Member, present
LT
Councillor Linda TiftCommittee Member, apologies

All 17 on the meeting page

On this subject at Newark and Sherwood

Search all
  1. Land At Newark Road, Wellow - 25/01862/PIPThis decision
  2. Land To The Rear Of 59 Beacon Hill Road, Newark On Trent, NG24 2JH - 25/02147/PIPAgreed
  3. Land On West Side of Newark Road, Ollerton - 23/02274/OUTMAgreed
  4. Land To The North Of Hawthorn Cottage, Main Street, Kirklington, Newark On Trent, NG22 8NL - 25/01823/PIPAgreed
  5. Land At Manor Farm, Sand Lane, Spalford, Newark On Trent, NG23 7HF - 25/00222/FULAgreed
  6. Land At Shannon Falls, Tolney Lane, Newark On Trent, NG24 1DA - 25/00573/S73Agreed

More from Newark and Sherwood Planning Committee

All decisions
MeetingDecisionOutcome
7 May 2026 Minutes of the meeting held on 9 April 2026AGREED that the minutes from the meeting held on 9 April 2026 were agreed as a correct record and signed by the Chair. Agreed Open
7 May 2026 Review of the Protocol for Planning Committee and the Planning Committee Scheme of Delegation to OfficersAGREED that: (a) no changes are currently required to the Protocol for Planning Committee or the Planning Scheme of D... Agreed Open
7 May 2026 Land to Rear of Mill Lane, Caunton (25/01952/FUL)AGREED Moved Councillor M Spoors and Seconded Councillor S Saddington (with 11 votes For and 2 votes Against) that co... Agreed Open
7 May 2026 Land to the East of Hockerton Road, Upton (26/00382/PIP)AGREED Moved Councillor K Melton and Seconded Councillor P Harris (with 7 votes For and 6 vote Against) that contrary... Agreed Open
7 May 2026 Land Adjacent Apple Cottage, Bilsthorpe Road, Eakring (26/00377/PIP)AGREED (with 10 votes For and 2 votes Against) that Permission in Principle be approved. Agreed Open