Resolved
- (a) That subject to an obligation being completed by 15 December 2011 to secure the maintenance of landscaping that is required outside of the application site adjacent to its western boundary, the application be permitted subject to conditions relating to the following:- ( i ) Time limit for commencement. (ii) Standard outline conditions regarding submission of the reserved matters of access, appearance, landscaping, layout and scale. (iii) Prior approval of levels. (iv) Controls over hours of works of construction. (v) Prior approval of a construction method statement and implementation of the approved methods during construction. (vi) Prior approval of recyclable materials and refuse, storage and disposal arrangements. (vii) Prior approval of external lighting, and implementation of any approved lighting scheme. (viii) No external speaker system, alarm bells and sirens to be installed without prior approval. (ix) Cumulative noise levels of any Plant not to exceed that set out in the Acoustic Report. (x) Prior approval and implementation of measures to ensure that noise levels do not exceed 51 dB L Aeg ,90 minute in any area of the gardens of 2 and 4 Kestrel Drive. (xi) Report of unexpected contamination. (xii) Controls over the importation of materials onto the site. (xiii) No development to commence until a 6 metre off-site landscaping buffer is agreed and implemented on land adjoining the western boundary of the site. (xiv) Tree Protection Plan. (xv) Detailed tree felling/pruning specification. (xvi) Protective fencing. (xvii) Tree replacement. (xviii) Construction of a temporary access prior to commencement of site construction works. (xix) Prior approval of details of 4.5m by 120m visibility splays. The visibility splays to be provided prior to commencement of construction and thereafter kept free from obstructions above 600mm above the adjacent carriageway level. (xx) Prior approval of details of the surfacing materials and surface water drainage. (xxi) Prior approval of a Construction Method Statement. (xxii) Provision of 2m wide footway linking from the development site to Kestrel Drive. (xxiii) Development not to be brought into use until the parking, servicing and turning areas are provided. (xxiv) Provision of secure weatherproof cycle parking prior to first occupation. (xxv) Off-site traffic calming on A53 incorporating lights, dragons teeth and anti-skid surfacing. (b) That should the obligations not be secured within the above period, the Head of Planning and Development be given delegated authority to refuse the application on the grounds that without the obligation being secured, the development would not provide and maintain a sufficient area for landscaping of what will be a prominent development, befitting its location on the edge of this village and complying with guidance contained within the Urban Design Guidance Supplementary Planning Document; unless he considers appropriate to extend the period for securing these obligations.