Resolved
- (a) That subject to the applicant entering into a S106 obligation by 1 May 2012 to secure the following:- ( i ) A financial contribution of £44,401 towards the Newcastle (Urban) Transport and Development Strategy ( NTADS ). (ii) A financial contribution of £167,751 towards public open space (such contribution to be spent at the Douglas Road site if an appropriate project can be identified, failing which to be spent at either The Wammy or Meadow Lane, following consultation with the Cross Heath ward members). (iii) A financial contribution of £77,217 towards the provision of education facilities. permission be granted subject to the undermentioned conditions:- (1) Standard Time limit condition. (2) Approved plans/drawings/documents. (3) Approval of all external facing and roofing materials. (4) Landscaping scheme. (5) The provision of additional street trees. (6) Details of boundary treatments. (7) Construction management plan and method statement including construction hours. (8) Contaminated land conditions. (9) Approval of recyclable materials and refuse storage. (10) Details of design measures to achieve acceptable internal noise levels in dwellings. (11) Road specification details. (12) Details of the proposed parking courts. (13) Approval of measures to provide adequate lengths of drives in front of proposed garages. (14) Surfacing details of proposed access drives. (15) Restriction of the use of proposed garages. (16) Submission of scheme to prevent surface water run-off. (17) Highway dropped crossing specification. (18) A management plan for the “Mews”. (19) Removal of property’s permitted development rights on identified plots. (20) Approval of existing and proposed ground levels and finished floor levels. (21) The development shall incorporate as gardens the track that runs along the eastern boundary of the site. (b) That should the matters referred to in ( i ), (ii) and (iii) above not be secured within the above period, the Head of Planning and Development Services be given delegated authority to refuse the application on the grounds that without such matters being secured the development would fail to secure the provision of adequate public open space, measures to ensure that the development achieves sustainable development outcomes or provision for education as applicable, or, if he considers it appropriate, to extend the period of time within which the obligation can be secured.