Resolved
(a) That subject to the applicant first entering into a Section 106 Obligation by 23 January 2013 to secure a contribution of £16,591 towards the Newcastle (urban) Transport and Development Strategy, the application be permitted in outline subject to the under-mentioned conditions:- (i) Standard time limit condition. (ii) Approved plans/drawings and documents. (iii) Approval of all external facing and roofing materials. (iv) Landscape scheme to include replacement tree planting. (v) Protection of retained trees and replacement measures in accordance with BS5837:2012 .. (vi) Provision of oil and fuel interceptors to the surface water drainage system. (vii) Provision of bound surface to the parking, turning and servicing areas. (viii) Demarcation of the parking spaces. (ix) External lighting to be designed to prevent light spillage on the public highway. (x) Provision of internal directional signage. (xi) Provision of a cycle shelter. (xii) Mitigation measures for the noise generating plant. (xiii) Measures to prevent noise emitted from the building. (xiv) Installation of the external lighting. (xv) Details of boundary treatments. (xvi) Development to be carried out in accordance with the submitted waste material storage and collection arrangements. (xvii) Contaminated land conditions. (xviii) Prior submission and approval of HGV Movement Management Plan. (xix) External noise mitigation measures to the office and training facilities. (b) That should the matters referred to in (a) above not be secured by 23 January 2013, the Head of Planning and Development be given delegated authority to refuse the application on the grounds that without such matters being secured the development would fail to secure measures to ensure that the development achieved sustainable development outcomes or, if he considers it appropriate, to extend the periodof time within which the obligation can be secured.