Resolved
Subject to the applicant first entering into Section 106 Obligations by no later than 14th April 2014, to secure the following: I. A financial contribution of £38,259 for open space enhancement/ improvements and maintenance. II. A contribution of £8,000 towards the Newcastle (urban) Transport and Development Strategy (NTADS). III. A contribution of £33,093 towards primary school provision. The application be permitted subject to conditions concerning the following matters:- • Standard time limit for commencement • Approved plans, to include reference to revised site layout plan received. • Prior approval of facing materials and implementation of approved details. • Prior approval and implementation of approved ground levels and finished floor levels. • Prior approval and implementation of a detailed Arboricultural site monitoring schedule, and appropriate Arboricultural works to the sycamore tree. • Prior approval of plans detailing 6m radius kerbs; a pedestrian crossing point including tactile paving; visibility splays of 2.4m by 43m; and an access gradient not exceeding 1:10 for the first 5m rear of the highway boundary. The access shall be completed before occupation of plots 7 to 14 and thereafter the visibility splays kept free of obstruction. • Prior approval and implementation of the widening of the footway to 2m on Banbury Street and the permanent closure of the existing site access and its reinstatement as footway. • No occupation until the access road, parking and turning areas have been provided in accordance with the approved plans. • Submission, approval and implementation of surfacing materials for the access road, parking and turning areas; surface water drainage for such areas; and delineation of parking bays. • Prior to occupation of plot 1 the parking spaces 1 and 2 shall be completed. • Any gates to be a minimum of 5m from the site boundary and open away from the highway. • Prior approval and implementation of a Construction Method Statement to include site compound; routing of construction vehicles; parking of vehicles; loading and unloading of plant and materials; storage of plant and materials; control of noise, vibration and dust; and wheel wash facilities. • Provision of an access strip width of 6m, 3m either side of the centre line of the sewer crossing the site. • The site to be drained on a separate system. • Contaminated land conditions. 2. Should the matters referred to in I-III above not be secured by 14th April 2014, that the Head of Planning be given delegated authority to refuse the application on the grounds that without such matters being secured the development would fail to secure an appropriate level of provision of adequate public open space; would not achieve sustainable development outcomes; and would not mitigation against the impact of additional pupils arising from a development of this scale in a location that has no capacity within primary schools or, if he considers it appropriate, to extend the period of time within which the obligations can be secured.