Resolved
(i) That, subject to the applicant entering into a Section 106 obligation by 21st September 2015 securing the review of the financial assessment of the scheme if there is no substantial commencement within a year of the grant of planning permission and contributions then being made to public open space and education on an equal proportion basis, if the scheme is evaluated at that time as able to support such contributions, the application be permitted subject to the undermentioned conditions: · Standard Time limit condition · Approved plans/drawings/documents · Approval of all external facing and roofing materials · Inclusion of windows in side elevation of plots 21 and 22 · Landscaping scheme · Details of boundary treatments, including to the rear of the adjoining commercial properties to block the existing gap · Construction Method Statement. · Provision of access drives, parking and turning prior to occupation . · Access to plots 4 to 11 to comply with submitted Cameron Rose Associates plan. · Width of driveway to plots 1 to 3 to be 4.5m for first 6m rear of the highway boundary. · Permanently closure of redundant access. · Driveways to be surfaced in a bound material for 5m from the highway boundary. · Surface water interceptors to be provided where driveways fall towards the public highway. · Contaminated land conditions · Site to be drained on a separate system with no surface water to be discharged into combined sewer network. · Provision of 10m access strip to public sewer crossing site. · Updating of ventilation system of adjoining fish and chip shop · Those conditions requested by the Coal Authority including remedial measures to address the coal mining legacy issues on the application site to be undertaken prior to the commencement of the development · Submission of a further noise assessment relating to noise from the adjoining industrial doors business and the details of the measures to be undertaken within the development to mitigate the impact of noise arising from that and other noise sources. Implementation of the approved details. · Prior approval of a scheme for the provision of a scheme with the tenure indicated in the appraisal. The scheme shall include the timing of the construction for the affordable housing, arrangements to ensure that such provision is affordable for both initial and subsequent occupiers and the occupancy criteria to be used for determining the identity prospective and successive occupiers of such units and the means by which such occupancy will be enforced. (ii) That, should the matters referred to above not be secured by the 21st September 2015, Head of Planning given delegated authority to refuse the application on the grounds that without such on obligation there would not be an appropriate mechanism to allow for changed financial circumstances, and in such circumstances the potential provision of policy compliant contributions towards education and public open space ; or , if he considers it appropriate, to extend the period of time within which such an obligation can be secured.