Resolved
(A) That, subject to the applicant (providing they first agree in writing, by noon on the 3 rd February, to extend the statutory determination period to the 7 th March 2017) entering into a Section 106 obligation by 3 rd March 2017 securing the following: (i) A management agreement for the long-term maintenance of the open space on the site (ii) A contribution of £99,732 (on the basis that the development as built is for the full 55 units and of the type indicated) or such other sum as determined by the Head of Planning as appropriate on the basis of policy), towards the provision of education places at Madeley High School (iii) In perpetuity, provision of 25% of the dwellings on-site as affordable units, The application be permitted subject to the undermentioned conditions: (i) Standard time limits for submission of applications for approval of reserved matters and commencement of development (ii) Reserved matters submissions (iii) Approved plans (iv) Construction hours (v) Construction management plan (vi) Waste storage and collection arrangements (vii) Arboricultural Impact Assessment (viii) Arboricultural Method Statement (ix) Tree protection plan (x) Full details of site access including footway along the site frontage (xi) Layout of site including disposition of buildings and provision of adequate parking and turning within the curtilage (xii) Visibility splays (xiii) Foul and surface water drainage scheme (xiv) Any reserved matters application to comply with the Design and Access Statement (xv) Recommendations of Phase 1 Habitat Survey to be complied with including buffer zone (xvi) Provision of information signs and details to new residents regarding SSSIs (xvii) Dwellings to be a maximum of 2½ storeys in height (B) That, should the matters referred to in ( i ), (ii) and (iii) above not be secured within the above period, that the Head of Planning given delegated authority to refuse the application on the grounds that without such matters being secured the development would fail to secure the provision of adequately maintained public open space, appropriate provision for required education facilities and an appropriate level of affordable housing; or, if he considers it appropriate, to extend the period of time within which such obligations can be secured.