Resolved
That the application be permitted subject to the undermentioned conditions: (i) Time limit for commencement of development (ii) Approved plans (iii) Demolition works not to proceed until planning permission granted for redevelopment and a contract let for that development (iv) Details and materials for the making good of the main building following the demolition of extensions (v) Method statement for repair and consolidation of stonework (vi) Further details of internal doors and window architraves where alterations are being made (vii) Details of repair work to existing windows and details including samples of proposed new windows (viii) Details of any secondary glazing systems (ix) Details of suspended ceilings system (x) Details of the mezzanine floor (xi) Details of the treatment of internal corridors and internal windows/fanlights (xii) Details of drainage requirements to service the en -suites (xiii) Details of all other proposed external materials (xiv) Any repointing to be in lime mortar Planning application 16/00796/OUT (A) That, subject to the applicant (providing they first agree in writing, by noon on 28 th April to extend the statutory determination period to the 9 th June 2017) entering into a Section 106 obligation by agreement by 6 th June 2017 to secure a review mechanism of the scheme’s ability to make a policy compliant contributions to public open space, travel plan monitoring and on street parking controls, if the development is not substantially commenced within 12 months from the date of the decision, and the payment of such a contributions if found financially viable, the application be permitted subject to the undermentioned conditions: (i) Standard time limits for submission of application for approval of reserved matters and commencement of development (ii) Reserved matters submission (iii) Approved plans (iv) Occupation to be restricted to students only (v) Residential parking survey of streets to be agreed prior to first occupation of the development and a second survey 12 months later when fully occupied (vi) Provision of access (vii) Off-site highway works (viii) Details of surfacing materials, surface water drainage and delineation of parking bays (ix) Closure of existing access (x) Car park access to remain ungated (xi) Provision of secure weatherproof cycle parking (xii) Travel plan (xiii) Construction method statement (xiv) Landscaping and tree protection conditions (xv) Contamination conditions with respect to controlled waters (xvi) Building recording (xvii) Written scheme of archaeological investigation (xviii) Construction and demolition hours (xix) Piling (xx) Dust mitigation (xxi) Dwelling noise levels (xxii) External materials (xxiii) Drainage conditions (xxiv) Implementation of security/crime prevention measures (xxv) Building wide ventilation system for Main Building (xxvi) Heating system of both Main and New buildings (xxvii) Phasing requirement (xxviii) Revised parking layout (xxix) Provision of 19 car parking spaces (B) Failing completion by the date referred to in the above resolution B(1) of the above planning obligation, that the Head of Planning be given delegated authority to either refuse the planning application on the grounds that in the absence of a secured planning obligation the public open space ... view the full minutes text for item 6.