Resolved
(1) That, subject to the applicant entering into a Section 106 obligation by agreement by 12 th November 2018 requiring a. financial contributions to the enhancement and maintenance of Queen Elizabeth Park of £124,560 ( allowing for the extant permission) and a travel plan monitoring fee of £2,200 b. a financial contribution of £50,000 to be used to fund a Resident Parking Zone in the event that it has been demonstrated (through surveys secured by condition) that the development has resulted in on street parking problems The application be permitted subject to the undermentioned conditions: (i) Time limit (ii) Approved plans (iii) Occupation to be restricted to students only (iv) Residential parking survey of streets to be agreed prior to first occupation of the development and a second survey 12 months later when fully occupied (v) Provision of access (vi) Off-site highway works (vii) Details of surfacing materials, surface water drainage and delineation of parking bays (viii) Closure of existing access (ix) Car park access to remain ungated (x) Provision of secure weatherproof cycle parking (xi) Travel plan (xii) Construction method statement (xiii) Landscaping and tree protection conditions (xiv) Contamination conditions with respect to controlled waters (xv) Building recording (xvi) Written scheme of archaeological investigation (xvii) Construction and demolition hours (xviii) Piling (xix) Dust mitigation (xx) Dwelling noise levels (xxi) External materials (xxii) Drainage conditions (xxiii) Implementation of security/crime prevention measures (xxiv) Building wide ventilation system for Main Building (xxv) Heating system of both Main and New buildings (xxvi) Air quality standards (xxvii) Kitchen ventilation system and odour abatement (2) That, failing completion by the date referred to in the above resolution (1) of the above planning obligation, that the Head of Planning be given delegated authority to either refuse the planning application on the grounds that in the absence of a secured planning obligation the public open space needs of the development would not be met and the development would fail to ensure it achieves sustainable development outcomes; or if he considers it appropriate, to extend the period of time within which the obligation can be secured.