Resolved
(A) That, subject to the applicant first entering into a Section 106 agreement by 20 th November 2018 to secure a review mechanism of the scheme’s ability to make a policy compliant contribution to public open space, if the development is not substantially commenced within 12 months from the date of the decision, and the payment of such a contribution and the provision of such affordable housing if found financially viable, the application be permitted subject to the undermentioned conditions: (i) Standard Time limit for commencement of development (ii) Approved Plans (iii) Facing and Roofing Materials (iv) Boundary Treatments, including retaining walls (v) Finished Ground and Floor Levels (vi) Removal of permitted development rights (vii) Visibility splays prior to occupation (and kept free from obstruction) (viii) Road, parking and turning areas prior to occupation (ix) Surfacing, surface water drainage and delineation of car parking spaces; (x) Existing site access made redundant to be closed and the crossing reinstated to footway; (xi) Garages retained for parking; (xii) Construction management plan (xiii) Tree protection plan (xiv) Arboricultural Method Statement (xv) Detailed Landscaping Scheme, including tree retention, replacement tree planting, and tree and hedge planting at the rear of plots 3 and 4. (xvi) Land Contamination (xvii) Construction Hours (xviii) Design measures to minimise noise on future occupiers (xix) Foul and surface water drainage details (xx) Ecology mitigation measures (B) That, Failing completion of the above planning obligation by the date referred to in the above recommendation, that the Head of Planning either refuse the application on the grounds that without the obligation being secured, the development would fail to secure an appropriate contribution for off-site public open space which would reflect the infrastructure needs of the development and (should there be a viability case for non-policy compliant contributions) there would be no provision made to take into account a change in financial circumstances in the event of the development not proceeding promptly; or, if he considers it appropriate, to extend the period of time within which the obligation can be secured.