Resolved
(A). That , subject to the applicant first entering into a Section 106 agreement by the 20 th February 2019 securing a financial contribution of £130,203 (index linked) towards the maintenance and improvement of public open space at Lyme Valley Parkway, restriction of the occupancy of the accommodation so that it falls within the C2 Use Class, and a travel plan monitoring fee of £2,360 (index linked), the application be permitted subject to the undermentioned conditions: (i) Standard time limit for commencement of development (ii) Approved plans (iii) Materials (iv) Boundary treatments (v) Finished ground levels and floor levels (vi) Detailed soft landscaping scheme, including replacement trees for the holly and willow screening to Lyme Valley Parkway that will be lost and any others that are removed to accommodate the development. (vii) Dimensioned Tree Protection Plan (viii) Detailed Arboricultural Method Statement regarding the surface water outlet and levels increase adjacent to the protected horse chestnut tree and site specific details of all special engineering within tree RPAs, including drainage if necessary. (ix) Schedule of works to retained trees (x) An arboricultural site monitoring schedule (xi) Submission and approval of access improvements (xii) Design improvements/ screens to balconies to prevent overlooking (xiii) Visibility splays (xiv) Access, parking, turning and servicing areas (xv) Submission and approval of a car park management scheme (xvi) Bus stop upgrades (xvii) Submission and approval of a travel plan (xviii) Submission and approval of secure weatherproof cycle parking (xix) Submission and approval of construction method / environmental management plan (xx) Waste management and collection arrangements (including hours restriction) (xxi) Surface water drainage design (xxii) Pumping station details – noise and odour impact (xxiii) Drainage plans for the disposal of foul and surface water flows (xxiv) Land contamination (xxv) External lighting (xxvi) Kitchen Ventilation System and Odour Abatement details (xxvii) Mechanical Ventilation of Residential Rooms (xxviii) External plant details (xxix) Electric Vehicle Charging Provision (xxx) Bat and Bird box provision (xxxi) Inclusion of a screen of evergreen trees planted as semi mature specimens within the Landscaping proposals in the vicinity of the Delbrook Court boundary (B). That , should the obligations referred to above not be secured within the above period, Head of Planning given delegated authority to refuse the application on the grounds that in the absence of such the proposal would be contrary to policy on the provision of affordable housing, open space for housing developments and monitoring of an acceptable travel plan, or, if he considers it appropriate, to extend the time period within which the obligation referred to above can be secured.