Resolved
(A) That, subject to the applicant first entering into a Section 106 agreement by 18 th December to require: i. In perpetuity, the provision of 25% of the dwellings as affordable units ii. A financial contribution of £373,793.00 towards the enhancement of public open space nearby the application be permitted subject to the undermentioned conditions:- (i) Time limit for commencement of development (ii) Approved plans (iii) Construction environmental management plan (iv) Prior approval of noise mitigation measures (v) Permanent closure of windows facing Ibstock Brickworks (vi) Details of facing and roofing materials (vii) Boundary treatments (viii) Drainage plans for the disposal of foul and surface water flows (ix) Retention of trees as shown in Arboricultural Report (x) Prior approval of a tree protection plan (xi) Landscaping proposals (xii) Submission and approval of a sustainable drainage strategy (xiii) Electric vehicle charging (xiv) Land contamination (xv) Remediation strategy regarding controlled waters (xvi) Revised details showing removal of traffic calming scheme and provision of bin collection areas (xvii) Provision of visibility splays (xviii) Provision of access, internal roads and private drives (xix) Parking spaces to be a minimum of 5m x 2.5m (xx) Details of surfacing materials for private drives and parking areas (B) Should the matters referred to in (i) and (ii) above not be secured within the above period, that the Head of Planning be given delegated authority to refuse the application on the grounds that without such matters being secured the development would fail to make an appropriate contribution towards the development, improvement and maintenance of public open space and an appropriate level of affordable housing; or, if he considers it appropriate, to extend the period of time within which such obligations can be secured.