Resolved
That the variation of Conditions 1 and 24 of planning permission 20/00609/FUL be permitted, to substitute approved plans with revised plans to secure amendments to the design of roof parapets and the landscape design of the third floor roof terrace, along with the rewording of condition 24 to read as follows; “Prior to the occupation of the development hereby approved the following Electric Vehicle Charging Provision shall be made available on site and maintained for the lifetime of the development; - 12 of the 48 parking spaces must be provided with a fully operational electric vehicle charging point, which shall include 1 disabled space and 1 staff parking space - All other parking spaces shall be provided with duct infrastructure to allow future charging point connection. - Charge points are to be a minimum of 32Amp with Type 2 Mennekes connections, Mode 3 (on a dedicated circuit) or equivalent. Reason: To enable charging of plug-in and other ultra-low emission vehicles in safe, accessible and convenient locations, in accordance with the requirements of the National Planning Policy Framework 2021.” and subject to the imposition of all other conditions attached to planning permission 20/00609/FUL that remain relevant at this time, amended as necessary. Watch the debate here