Resolved
Resolved : (A) That, s ubject to the applicant entering into a Section 106 obligation by 17th March 2023 to secure the following: · A contribution of £10,000 towards travel plan monitoring · A contribution of £174,500 towards primary education · A contribution of £5,579 per dwelling to off-site open space The application be permitted subject to the undermentioned conditions: (i) Standard time limit for commencement of Development (ii) Approved plans (iii) Facing and roofing materials (iv) Boundary treatments (v) Hardstandings (vi) Woodland and open space management plan (vii) Arboricultural Method Statement (viii) Waste collection and storage arrangements (ix) Details of vehicle access works including engineering works to reform the existing access onto Clayton Lodge (x) Details of offsite highway scheme to implement tactile pedestrian crossing on Clayton Road (xi) Details of the design and construction of any new roads, footways and accesses (xii) Restriction on the gradient level of highway carriageway (xiii) Provision of access, parking and turning areas (xiv) Provision of cycle storage areas (xv) Details of surface water drainage interceptors (xvi) No soakaways or attenuation tanks are to be placed within 4.5m of the highway boundary (xvii) Submission of a Structural Design Assessment (xviii) Submission of a Travel Plan (ix) Construction Method Statement (xx) Electric vehicle charging provision (xxi) Construction and demolition hours (xxii) Works to be completed in accordance with the surface water drainage details (xxiii) Temporary arrangements for the control of surface water and pollution are to be in place prior to completion of the proposed (xxiv) Land contamination investigations and mitigation measures (xxv) Unexpected land contamination (xxvi) Ecology mitigation and enhancements (xxvii) Drainage plans for the disposal of foul and surface water (B) Should the Section 106 obligation referred to in (A) above not be secured within the above period, then the Head of Planning be given delegated authority to refuse the application on the grounds that without such matters being secured, the development would fail to be acceptable in planning terms and would not achieve sustainable development outcomes; or, if he considers it appropriate, to extend the period of time within which the obligations can be secured. Watch the debate here