Resolved
Planning permission granted subject to the amended conditions as set out in the report and additional conditions.
Planning Committee decided this item on Thursday 24 March 2016. Below is the council's own wording, with the papers it was decided on.
Resolved
Planning permission granted subject to the amended conditions as set out in the report and additional conditions.
Planning Committee 24 March 2016
Reference: 2015/1673/01/DET
Proposal: Erection of 71 residential dwellings (Use Class C3) and pumping station with associated access, landscaping and engineering works as amended and supplemented by information received up to and including 9 March 2016
Location: Land to the North of Front Street, adj White Swan PH and The Quarry House, Dinnington
Applicant: Bellway Homes Ltd (North East)
Report by: Assistant Director Planning - Investment & Development
Ward Implications: Castle
Development Management Area: SLR
Introduction
1. This application is a detailed application for the erection of 71 dwellings to the north of Front Street, Dinnington.
2. Members of the Planning Committee will recall that they carried out a site visit on 28 January 2016 to view this application site.
Site Description
3. The site at Dinnington is roughly 2.6 hectares in size and triangular in shape, and is located to the west of the main existing residential area of Dinnington village. The site is bounded to the north by open paddocks, to the west by allotments and to the east by residential properties and smaller paddock areas. To the south the site is bounded by Front Street, with the White Swan public house positioned towards the south west corner.
4. The site is raised slightly higher than the main road, with the highest areas positioned towards the east. The site slopes gradually downwards towards the west and north. There are few landscape features or tree cover within the application site but there are some trees worthy of retention around the edges of the site. Trees and hedges are most evident along the western and southern boundary with the north and eastern boundaries being relatively open.
5. The application site is one of two sites allocated for housing within Dinnington following the adoption of the Core Strategy in March 2015. This site is the smaller of the two, with the larger site located on the opposite side of Front Street.
Proposal
6. The proposed development consists of the erection of 71 dwellings with associated access, landscaping and boundary treatment. The main vehicular access to the development would be taken directly from Front Street approximately 75 metres to the east of the White Swan car park entrance.
7. Housing would consist of terraced, semi-detached and detached two storey properties ranging from 2 to 4 bedrooms in size. Each property would have gardens to the front and rear, with all properties having access to at least one off street parking space. Access to each property would be from the main access roads into the development, or from areas of shared surface or private road.
8. The proposed materials for construction of the dwellings consists of brick, render and stone. The development has been laid out in two character areas with properties fronting onto Front Street and those surrounding the central green space designed to reflect the traditional style of properties in the village. Elsewhere a simpler, more contemporary approach is proposed.
9. Also proposed is the installation of foul water pumping station which would be located at the south western corner of the site to the rear of the White Swan public house. This would consist largely of development below ground with a small kiosk and service area above ground. It would be screened by timber fencing restricting view from the proposed housing.
10. A detailed landscaping plan has been provided which includes two areas designed as multifunctional spaces. These are located within the centre of the site and towards the west at the site’s lowest point. Whilst providing an area of green space, the areas also double up as SUDs areas to assist with the proposed drainage of the site.
Relevant Planning History
11. There is no planning history considered relevant to this application.
Consultation and Publicity
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
2015/1673/01/DET: Land to the North of Front Street, adj White Swan PH and The Quarry House, DinningtonReport | 196 KB | DownloadRead as text |
PDF |
P624mardg: Dinnington North: PLANReport | 309 KB | Download |
Follow Planning Committee at Newcastle and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 4 Sep 2026 | Application 2025/2070/01/EIA - Hadrian House, Higham Place, Newcastle Upon Tyne, NE1 8AF - Monument WardCommittee was minded to grant planning permission for application reference 2025/2070/01/EIA: (i) Subject to a sectio... | Agreed | Open |
| 4 Sep 2026 | Application 2015/0897/78/RES - Site Bounded by Whorlton Hall and Cottages to the North, Westerhope Golf Course to the East and Stamfordham Road and Chapel Park Estate to the South and West, Newcastle Upon Tyne, NE5 1NP - Newbiggin Hall and Callerton WardReserved matters approval for application reference 2015/0897/78/RES was granted , subject to the following condition... | Approved | Open |
| 10 Jul 2026 | Application 2026/0419/01/DET - The Balloon, Silver Lonnen, Newcastle upon Tyne, NE5 2HB - West Fenham WardPlanning permission for application reference 2026/0419/01/DET be refused for the following reasons: i. The proposed ... | Refused | Open |
| 10 Jul 2026 | Application 2026/0105/01/DET and 2026/0106/01/LBC - LD Mountain Centre, 30-34 Dean Street, Newcastle Upon Tyne, NE1 1PG - Monument WardPlanning permission for planning application reference 2026/0105/01DET be granted, subject to the following condition... | Approved | Open |
| 19 Jun 2026 | Application 2025/1251/01/DET - 7-45 Lime Street, Byker, Newcastle Upon Tyne, NE1 2PQ - Ouseburn WardCommittee was minded to grant planning permission for application reference 2025/1251/01/DET: (i) Subject to a Sectio... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.